Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1336

Support for IFC 4 and 4x1

I work with linear Projects. Trains, Roads, Bridges. Most of these Software have recently added IFC support, but only for the schema 4x1 because it's the only one that supports alignments. Please, add it. It's very painful to go back to dwg just b...
Guest about 5 years ago in SYNCHRO 4D Pro / Integrations 2 Future consideration

Add multiple work areas at once

Besides the title, it would be great if one could also use 2D hatches to create work areas ( for example from AutoCAD)
Patryk Makowski over 1 year ago in SYNCHRO Modeler 0 Needs review

Activity Code Descriptions in the Scheduler

Primavera P6 allows for viewing activity code descriptions for grouping tasks rather than just the activity code. The activity code is usually a batch of symbols due to P6'es character limits for activity codes and that makes it a real pain in Syn...
Patryk Makowski over 1 year ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 7

Cross Section Auto Annotation

The cross section tools in Field have limited use, especially to non-designers. Some sort of auto-labeling (ideally of slopes, elevations, material types for meshes, etc.) that could be toggled on and off would be extremely helpful.
Ariel Froerer 8 months ago in Field / Models | Tools 0

% Complete calculated consistenly with Physical Quantities

In SYNCHRO, despite is possible to calculate progress of leaf activites through Physical Quantitities, their "father" activities are still calculated by Duration (as their children progress is calculated by Automatic/Duration). % Complete of non-l...
Gabriele Barone over 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Likely to implement

Ability to undock iModel 4D Viewer and/or Task list in the Schedule module

It would be nice to use multiple monitors to review an expanded Task list on one screen, the 4d model on the other. Currently everything gets pretty cramped within one screen, and will get worse when additional columns for Tasks are made available...
Arpit Prakash almost 4 years ago in SYNCHRO Control / Models 0 Future consideration

Ability to move files seamlessly between PW and Control > Documents

No description provided
Arpit Prakash about 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Ability to bulk update Document Folder Access

Currently, the way this is set up is to remove access for one Role, all other Roles need to be given access, by manually checking on each. If we had a bulk update option, it will be easier to simply remove the restricted users.
Arpit Prakash about 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Ability to receive periodic reports of Forms assigned to a user

Admin should be able to specify which Form types should be part of a daily report, that gets sent out periodically to the assigned users.
Arpit Prakash about 2 years ago in SYNCHRO Control / Reports 0 Future consideration

Autodesk BIM360 Integration with iModel

Allow for integration/sync with Autodesk BIM360 sync with iModel, not just ProjectWise.
Connor Smith about 4 years ago in SYNCHRO Control 0 Future consideration