Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1304

Related/escalated forms export

Currently the only way to see the escalated/related forms is through PDF export and explicitly chosing the AUdit trail. Even so, the forms are presented in chronological order mixed with other changes to teh form data. Users want to see an easy or...
Kiril Tasev about 1 month ago in SYNCHRO Control / Forms 0

User History in Resources Status from SYNCHRO Field

When working with SYNCHRO Field, multiple users can update Resources Statuses from the field. Subsequently, all updates that these users make are visible in the Resources Properties > Status > History window of SYNCHRO 4D Pro. However, only ...
Jean Delgadillo over 1 year ago in SYNCHRO 4D Pro / Cloud-hosted Control projects 0 Future consideration

Ability to download a previously uploaded cost code excel sheet.

if you have a user who originally created a cost code excel spreadsheet upload, and they leave the company, we have no way to download and/or update the cost code structure without a version of the file. Currently you need the original spreadsheet...
Corey Johnson 2 months ago in SYNCHRO Modeler 0 Needs review

Ability to manually save changes in Forms Designer

When designing large Forms, the performance heavily degrades on any action like selection, editing, etc, due to auto-save continuously running in the background. This could be a toggle to enable/disable as required.
Arpit Prakash 7 months ago in SYNCHRO Control / Forms 0

Supply Chain Implementation

Add in the full bidding cycle into Synchro, add in the following: Pre-Bid - Bid invitations, Invitations to Bid, Custom Bid Forms(Cost and Schedule), Add Deliverables Management or ProjectWise direct connection for drawings/spec upload Bidding - S...
Guest about 2 years ago in Contracts 2 Planned

Ability to bulk create Actions/Scripts through Excel Configuration Spreadsheet

No description provided
Arpit Prakash 8 months ago in SYNCHRO Control / Forms / Inspection 0 Planned

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest about 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Bulk Edit Open Form

We like the use of forms to manage temporary construction assets such as Traffic Control Devices and Stormwater Management. These items require daily to weekly maintenance. In order to show inspection happened on a project wide basis, bulk editing...
Andrew Pangallo about 1 month ago in SYNCHRO Control / Forms 0

Add scheduling services to composite iModels

Add scheduling services to composite iModels to create 4D models.
Kevin Vivien 7 months ago in SYNCHRO Control / Models 0

Hide Draft and Archived Inspections Forms when creating a new Inspection

No description provided
Arpit Prakash 6 months ago in SYNCHRO Control / Inspection 0