Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1333

matrix of assigned users to forms in a project or group of projects

When onboarding and specifically when removing people from forms it would be useful to have the ability to export/download a matrix of users vs assigned to forms. That would help maintain visibility over which forms the user has a role in.
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to re-assign/copy forms

This is possible in Control, but not in Field.
Arpit Prakash over 1 year ago in Field / Forms | Forms / Forms | Inspections 0 Future Consideration

"Categories"needs to be an advanced search and data visualization option

There is no way to save a search based on Categories (or level names). Categories (level names in dgns) have significant meaning in the models. Being able to search for a group of categories that have a descriptive word (rebar, top, abut, etc) is ...
Guest almost 2 years ago in SYNCHRO Control / Models 0

In the map view would like to see the direction a camera was facing when the picture was taken

No description provided
Bill McNamara almost 4 years ago in SYNCHRO Control / Media Indexing 0 Future consideration

Add multiple work areas at once

Besides the title, it would be great if one could also use 2D hatches to create work areas ( for example from AutoCAD)
Patryk Makowski over 1 year ago in SYNCHRO Modeler 0 Needs review

Activity Code Descriptions in the Scheduler

Primavera P6 allows for viewing activity code descriptions for grouping tasks rather than just the activity code. The activity code is usually a batch of symbols due to P6'es character limits for activity codes and that makes it a real pain in Syn...
Patryk Makowski over 1 year ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 7

Undo Button or Action in SYNCHRO Modeler

Need an undo button to remove previous actions similar to ORD. This will also help prevent starting over after hiding elements.
Dee User List Acosta over 2 years ago in SYNCHRO Modeler 0 Needs review

Capability to extract the list users and their roles across all projects

For Acct reviews and stocktaking of all the roles and users across all projects.
Guest over 4 years ago in SYNCHRO Control / Admin 0 Planned

% Complete calculated consistenly with Physical Quantities

In SYNCHRO, despite is possible to calculate progress of leaf activites through Physical Quantitities, their "father" activities are still calculated by Duration (as their children progress is calculated by Automatic/Duration). % Complete of non-l...
Gabriele Barone over 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Likely to implement

Resource Status - Update percentage base of quantity

If a task is planned for 10 days to pour 100 cubic meters of concrete. The user would like to be able to update the quantity (cubic meters) using the Field app - Status update
Paolomee Udani almost 4 years ago in Field / Status update | Resources 0 Planned