Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 468 of 468

Model Not Appear When we do Resource Progressing

When we do resource progressing, and if we have a Removing Activity, the component geometry is not appear. We need to set the timeline to the task date so we can see the geometric. To help user easily get the timeline for that task, it is good to ...
Indrawan Gmail almost 4 years ago in SYNCHRO Field / Status update | Resources 2 Already exists

WPS to AWP Battle Board Integration

Use synchro for scheduling to link to p6 Use Csim planner to build IWP Push data to Synchro Control/Field/4D
Ryan Posnikoff almost 6 years ago in SYNCHRO Control 0 Planned

Dockets: allow users to have the ability to approve in bulk.

Although the Docket Inbox allows a user to approve multiple Dockets, it is limited to a single day and still requires the user to select dockets individually.
Luke Read about 2 years ago in SYNCHRO Perform / Dockets 0 Future Consideration

Ability to Disable Bing Map by Default in iModel

Is there a way to turn off Bing map by default on model loading?
Derryl Acosta about 4 years ago in [Archive] SYNCHRO 4D Review 0

Detach Schedule window from model window for dual monitor use

it will enable having both 3D and schedule views on different screens for better collboration.
Guest about 4 years ago in [Archive] SYNCHRO 4D Review 0

When object is selected it highlights tasks associated (Status update view)

When 3D odject is selected in Status view the accosiated task should be highlighted. Similar to when a 3D object is selected in the schedule view in Control.
Thomas Schimpf about 4 years ago in SYNCHRO Field / Status update | Resources 0 Planned

Pre-filled Template in Events (Mobile App)

In the Description section in Event (Mobile app) it would be great if we can have Pre-filled Template so I want the user to have a set list of details to fill in for the description for consistency.
Abhi Kotecha about 2 years ago in SYNCHRO Perform / Events & Notices 1 Future Consideration

Manpower Productivity Report

Based on Project Schedule, allocated manpower and site field tracked Material utilization to find individual or team manpower Productively data. This data useful for further planning in similar work and find good team for productivity. Example:Own...
ASHWIN RAJESH K about 2 years ago in SYNCHRO Perform 1 Future Consideration

Ability to Remove Physical Object Layers from Model Tree

It would be nice to have the ability to remove these (hide/unhide) from the model tree to simply navigation of the model in the Model Tree. Or just remove them?
Mike Ranney about 4 years ago in [Archive] SYNCHRO 4D Review 0

Scripts copied to different forms

Scripts should be accessible like Bindings over all the forms in your project. For very complicated scripts it can become really repetitive and having a search feature would be extremely useful and user friendly
Max Hamill about 2 years ago in SYNCHRO Control / Forms 0 Planned