This idea refers to using Synchro Control with an iModel with Projectwise Connections. When viewing the Connections I think it is essential to be able to see the version of the model, e.g. P03 or C06. The model version isn't listed on the Connecti...
1. Allow Project Admins/Project Owners/Document Controller to Delete Forms created in error in progress 2. Allow admins to download a list of all Bindings. 3. Delete Binding Created by Administrator4. Have a separate Test Area in Control, within t...
Currently, the system binding Assigned to is able to be used to populate user lists using scrips, but not the other way around. By allowing the user lists to populate this system binding we can automate workflows and reduce the manual work for use...
Currently, system bindings only include Assigned to and Assigned users. To simplify script configurations and allow for more automated workflows, there is a need to include more. Created by - This would allow a script or a workflow transition to s...
Calendar view of all due dates in "My Work" is great but a similar view for individual form types would be beneficial for users that need to triage work for specific forms types.
Ryan Posnikoff
over 1 year ago
in SYNCHRO Control / Forms
1
Future consideration
A folder can be locked by any Role having corresponding permissions, however, there may be instances when the user is not available to grant access to the files.
if form A is escalated to form B, each form need to be exported separately. have the option to export both forms in one PDF document if one form is escalated to another.
Siti Nurhazirah Mokmin
almost 4 years ago
in SYNCHRO Control / Reports
0
Future consideration