Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

SYNCHRO Control

Showing 755

Create a rule for printing when the fields are empty

For example: Create general rules so that if fields are empty, they print with “—".
Yessica Andrade Barbosa about 1 year ago in SYNCHRO Control / Forms 0

Possibility to add more columns in "My Work"

No description provided
Yessica Andrade Barbosa about 1 year ago in SYNCHRO Control / Forms 0

Enable Direct Assignment When Reopening Forms

When reopening the form could be possible to assign that reopening directly. 
Yessica Andrade Barbosa about 1 year ago in SYNCHRO Control / Forms 0

Add a Pin on a Form

There Should be a possibility to set a Control with a pin. That means when you choose it you should be able to set a Pin to save this Control Value. E.G: when you collect defects on the same level you don't need to fill the Level every time for ea...
Alexander Koenig about 1 year ago in SYNCHRO Control / Forms 0

Group roles and users in 'Assign to'

In 'Assign To' and 'Multi Assign' it would be nice to have the users and the roles grouped together. For exampel 'Role: Designer' and then underneath that all the users in that role, and then the next role with associated users underneath that and...
Arnar Agustsson over 2 years ago in SYNCHRO Control / Forms 1 Already exists

Ability to provision SYNCHRO Control on Government cloud

Many times government entities (like nuclear power plant, transport authorities ) ask for the availability of SYNCHRO Control on the government/private cloud.
Manoj Jamma over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Schedule Filtering Option

Please add option to filter tasks by either ID or Task name, additionally include option to collapse / expend all or to level
Michael Shepherd over 3 years ago in SYNCHRO Control 1 Planned

Infrastructure Cloud - Help Link only Show ProjectWise Link

When we use Infrastructure Cloud Link, and open SYNHCRO project, the Short Cut Link in top Right (just before Profile) still show ProjectWise link. I think need to change to SYNCHRO if we are opening SYNCHRO Project.
Indrawan Wijaya about 1 year ago in SYNCHRO Control / Admin 0

Auto suggest existing Tags when entering a new tag when editing a Plan Sheet

As I type in a TAG for a plan sheet, if as I type there are existing tags that match the current pattern, suggest them to me. This allows me to pick from an existing tag and helps to maintain consistency avoiding typos as well as duplicate tags th...
Paul Johnson over 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Ability to map the date tied with a Signature control seperately to a fillable pdf

Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0