PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1310

Cancel Button not intuitive

On SYNCHRO Control, when you have a form open and you want to close it, you have to click "cancel" to exit the form. This is not intuitive, because it looks you are canceling the form (in other words, it looks you are erasing all the information)....
Miguel Meninas 6 months ago in SYNCHRO Control / Forms 0

Delete or reassign multiple costs at one time

Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher almost 2 years ago in SYNCHRO Modeler 0 Future consideration

Cross section selection tool on other views

It can be hard to select lines, items or layers in congested areas of the model. Especially when you have big ol construction fingers. It would be very helpful if the Cross-section selection tool was available on all views for easier model selecti...
Thomas Schimpf almost 2 years ago in Field / Models | Tools 0 Future Consideration

Synchronization of tasks from .sp files schedules by Task ID without use of GUID.

In the settings menu there is an option for Primavera P6 to use activity IDs for synchronization. The same option for Synchro .sp files (and other formats) would be very useful as synchronization from external data goes through GUIDs by default. B...
Varvara Kleshchevnikova over 3 years ago in SYNCHRO 4D Pro / Integrations 0 Future consideration

% Complete calculated consistenly with Physical Quantities

In SYNCHRO, despite is possible to calculate progress of leaf activites through Physical Quantitities, their "father" activities are still calculated by Duration (as their children progress is calculated by Automatic/Duration). % Complete of non-l...
Gabriele Barone almost 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Likely to implement

In resource Usage Matrix freeze column up to rate code

Hi currently the resource usage matrix has column frozen until Row Total, can the columns freeze be until Rate Code
Nageshwar Sesetti over 2 years ago in Perform / Timesheets 0 Future Consideration

Within the PDF Plan sets text search

I would like a "google" like search of all the text to locate street names and lot numbers across the PDF set. I would like to search for the matching sheets and when in the sheet see the matching text strings
Bill McNamara over 4 years ago in SYNCHRO Control / Plan Sets 0 Already exists

Able to do Concatenate Some Bindings to a Target Binding

User want to have the function that able to Combine value from some different binding to another single Target Binding. Example to Combine generate single Document Number from different field.
Indrawan Wijaya about 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Restrict Events to be assigned to non bookable activities

Currently Events could be related to archived, finished, non bookable activities even if it 2 years over. The workflow should flag to the Event creator that the related activity is finished, non bookable and cannot be created until Contracts/ Cont...
Nageshwar Sesetti over 2 years ago in Perform / Events & Notices 1 Future Consideration

I want to be able to "attach" issues from the entire project to a plan set mark up, not just be limited it to the issues on the drawing.

No description provided
Beth Buerger about 1 year ago in SYNCHRO Control / Plan Sets 1