PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1309

Exported 4D synchro .fbx format when linked with 3ds max file texturing is not possible

Our Team is working on one project and our scope is to export 3D model from synchro as .fbx file and link that file into 3ds max to create rendering according to the planned dates from schedule because we need to update that file multiple times as...
Trishi Ashware almost 2 years ago in SYNCHRO 4D Pro / Import/Export 1

Downloading folder and subfolders

When selecting a parent folder should i not get all the subfolders and files? Currently, when I select a folder from the document I'm only getting 1 folder and non of its subfolders and files
Dan Sheldon over 4 years ago in SYNCHRO Control / Documents 0 Future consideration

% Complete calculated consistenly with Physical Quantities

In SYNCHRO, despite is possible to calculate progress of leaf activites through Physical Quantitities, their "father" activities are still calculated by Duration (as their children progress is calculated by Automatic/Duration). % Complete of non-l...
Gabriele Barone 12 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Likely to implement

scan multiple documents using synchro

I like the way Dropbox functions and allows several documents to be scanned or uploaded at one time. I do see value in having a function like that through synchro
Misti Daigle 6 months ago in SYNCHRO Control / Forms 0

Being able to add KMZ file to a individual form

Being able to add KMZ file to a individual form
Misti Daigle 6 months ago in SYNCHRO Control / Forms 0

I want to be able to "attach" issues from the entire project to a plan set mark up, not just be limited it to the issues on the drawing.

No description provided
Beth Buerger 12 months ago in SYNCHRO Control / Plan Sets 1

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon almost 2 years ago in Field / Forms | Forms 1 Will not implement

The Map Layers doesn't support weather

Would like to be able to see Radar and other map-related weather items as you can see in the Map view in Control. This is needed to attach to forms to show why a delay may have happened
Dan Sheldon almost 2 years ago in Field / Forms | Forms 0 Future Consideration

When creating a workflow and deciding which Properties should be Enabled or Disabled based on workflow status, we only want to see the bindings associated to the form we are working on, not all Bindings in Control. This can be confusing.

When deciding which bindings so be enabled or disabled within a workflow it would be helpful to see on the bindings associated to the form we are working with. Right we have a view of all bindings.
David Dudek Jr. almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Delete or reassign multiple costs at one time

Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher almost 2 years ago in SYNCHRO Modeler 0 Future consideration