Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1322

We want to be able to run a report which could create an "Audit Trail" by User ID.

In SYNCHRO control would like to have an option to run a report which would create an "Audit Trail" by user ID or task. Almost like a key stroke report. There are times when our users are working on multiple functions in SYNCHRO and at the same po...
David Dudek Jr. over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Can progress be performed without 3D

For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Derryl Acosta about 4 years ago in Field / Status update | Tasks 1 Planned

The method to define separator used in automatching rule must be refined

When a separator is defined anything that is written in the separator option is considered a separator. This becomes an issue when the client uses one of the separators while defining element code or task code. The rule doesn't work properly. Exam...
Jerry David Jaypaul about 1 year ago in SYNCHRO 4D Pro 2

provide upload of editable bindings in flow state definition

When we create Form we can now download the form definition. From there it is very easy to create an excel file with the Editable bindings per status. Having option to upload this into the state definition will speed up the development and tweakin...
Kiril Tasev over 2 years ago in SYNCHRO Control / Forms 1 Future consideration

refreshing browser does not land at where I was in browser. Retain view after refresh

When looking at a schedule of instances of a list of forms (more than 1000 instances) to get to a specific range of instances I have to click multiple times on the paginated list at the bottom of the register. Once there if I press F5 or refresh t...
Kiril Tasev about 1 year ago in SYNCHRO Control 0 Future consideration

Ability to re-assign/copy forms

This is possible in Control, but not in Field.
Arpit Prakash about 1 year ago in Field / Forms | Forms / Forms | Inspections 0 Future Consideration

Add option to transfer comments and photos from one activity to another.

Often photos and comments are uploaded to the wrong activity number. This results in a lengthy process to download the photos and re-enter the comments to the correct activity. Additionally, the person reviewing the entries is often not the same p...
Jackson Morley almost 3 years ago in Perform / Site Records 0 Future Consideration

Add multiple work areas at once

Besides the title, it would be great if one could also use 2D hatches to create work areas ( for example from AutoCAD)
Patryk Makowski about 1 year ago in SYNCHRO Modeler 0 Needs review

Wrap Text for Activity Name

We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
Sagar Soni about 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Ability to Filter by Float Path

Its important to be able to back track logic and the drivers in a particular string or path. In other scheduling software, I do this by filtering or grouping by Float Paths. This allows the team to analyze driving activities quickly. Furthermore w...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Planned