Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1335

Can progress be performed without 3D

For some projects the Client may not want or may not have a iModel to upload, but have developed a schedule (wbs and tasks). Synchro Field usually allows select the 3D objects and assign progress directly to them (after that tasks are progressed t...
Derryl Acosta about 4 years ago in Field / Status update | Tasks 1 Planned

I would like the ability to add additional fields into the Field App View for Forms

I would like the ability to add additional fields into the Field App View for Forms. This option will allow us to be able to sort on a specific field in the field App.
David Dudek almost 2 years ago in SYNCHRO Control / Field/Mobile 0

Implementation of a "split screen" feature within the Field app

have a "split screen" capability to see PDF document while keeping the view of the model, similar to what iPad can do.
Tony Bonacorsi almost 2 years ago in Field / Models | Visibility 1 Future Consideration

Composite iModels not usable for Synchro scheduling

Please add the option to use the composite iModels for Scheduling services, now it's not possible to filter out data from an existing iModel and start working with Synchro 4D
Christiaan Post 7 months ago in SYNCHRO Control / Models / Schedule 0

When selecting multiple elements in the model add their quantities together

When selecting multiple elements in the model add there quantities together rather than returning "Varies" If I select two runs of curb and gutter the first being 150ft long and the second being 198ft long I want to get 348ft of curb and gutter in...
Dan Sheldon over 2 years ago in Field / Models | Display 0 Future Consideration

Wrap Text for Activity Name

We have very Detailed activity names, and even after Reducing the Task Indent Space reading activity name is still difficult. If we expand the Activity name column then the Activity Start and Finish date will disappear behind the Gantt. Wrap text ...
Sagar Soni over 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

Provide hosting service for Apps/scripts

Provide hosting service for apps/scripts to run on cloud service as a backend. Provide options for python, php, javascript with working IDE to allow users to develop in sandbox mode and run in production mode service application scripts that inter...
Kiril Tasev 7 months ago in SYNCHRO Control / APIs 0

I want to update inspection form status for multiple forms at a time

As a user, when I select more than one inspection form in Admin/Manage Forms/Inspections, the Change Status and Delete buttons grey out. I'd like to be able to change the status of multiple forms at the same time.
Mariano Colicchio about 1 year ago in SYNCHRO Control / Inspection 0 Future consideration

We want to be able to run a report which could create an "Audit Trail" by User ID.

In SYNCHRO control would like to have an option to run a report which would create an "Audit Trail" by user ID or task. Almost like a key stroke report. There are times when our users are working on multiple functions in SYNCHRO and at the same po...
David Dudek Jr. over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Ability to Filter by Float Path

Its important to be able to back track logic and the drivers in a particular string or path. In other scheduling software, I do this by filtering or grouping by Float Paths. This allows the team to analyze driving activities quickly. Furthermore w...
Kristina Henkai over 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Planned