Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1342

Enable Linked/related/escalated forms to be exported with the Parent

Provide ability to export linked/related/escalated forms with on of the Donor/Parent forms. E.g. Form A is related to Form A.A. Click checkbox in front of Form A and select Export to PDF. Choose all standard parameters. Provide additional toggle t...
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration

more task filters options

Currently you can filter with a time frame and the 3d view will adapt to it. user should be able to filter by human resource, material resource, equipment resource, and location resource. user should also be able to filter by work package descipli...
Shaohua Guan over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon over 2 years ago in Field / Forms | Forms 1 Will not implement

The Map Layers doesn't support weather

Would like to be able to see Radar and other map-related weather items as you can see in the Map view in Control. This is needed to attach to forms to show why a delay may have happened
Dan Sheldon over 2 years ago in Field / Forms | Forms 0 Future Consideration

Import Appearance profile assignments from Excel

Hello! It will be very usefull to be able to export / import to / from Excel an Appearance profile assignments on Resource assignments worksheet.
Igor Saenko over 4 years ago in SYNCHRO 4D Pro 0 Future consideration

Stamp a PDF with a custom stamp via a Web Services API call

(MUST) As a Bentley developer I want to be able to stamp a PDF file with an image/text via a Web Service API call using PDFTron (Apryse). (MUST) As a Bentley developer I want to be able to specify the location of the stamp to allow for positioning...
Paul Houghton about 1 year ago in SYNCHRO Control / APIs 0 Already exists

Project creation through the API

When creating a project using the ITwin API that project is not visible in SYNCHRO Control. Project creation through the Projects API was a request they made when the Projects API was being migrated into the iTwin API and never responded too.
Russ Campton about 1 year ago in SYNCHRO Control / APIs 0

Delete or reassign multiple costs at one time

Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher over 2 years ago in SYNCHRO Modeler 0 Future consideration

Cross section selection tool on other views

It can be hard to select lines, items or layers in congested areas of the model. Especially when you have big ol construction fingers. It would be very helpful if the Cross-section selection tool was available on all views for easier model selecti...
Thomas Schimpf over 2 years ago in Field / Models | Tools 0 Future Consideration

Calendar of non working days

Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Rocky Ursino about 1 year ago in EVM (Perform) / Reports 1 Future Consideration