PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1297

Ability to change status of more than one form at a time

Having to manually turn each form from published to draft just takes too long
Guest over 3 years ago in SYNCHRO Control / Forms 2 Future consideration

Add cost codes within modeler tree and have capability to export cost code configuration.

The default format of setting up a cost code configuration to attach to a model is too rigid. It is almost impossible to determine which codes will need to be incorporated for a design build project model. As designers update models more codes wil...
David Gallaher over 1 year ago in SYNCHRO Modeler 0 Future consideration

Ability to filter/select PDF settings plan sheets by user defined tags.

In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...
David Gallaher over 1 year ago in SYNCHRO Control / Plan Sets 0 Future consideration

Exported 4D synchro .fbx format when linked with 3ds max file texturing is not possible

Our Team is working on one project and our scope is to export 3D model from synchro as .fbx file and link that file into 3ds max to create rendering according to the planned dates from schedule because we need to update that file multiple times as...
Trishi Ashware over 1 year ago in SYNCHRO 4D Pro / Import/Export 1

Imodel Saved Views - Don't turn on new content by default

Currently, if we add new levels or new references to our source DGN files and then re-sync imodels, those new elements get turned on in every saved view. We don't want this. We want the option to turn on new content but to not have it alter our ex...
Ariel Froerer 5 months ago in SYNCHRO Control / Model Viewer 0

Add current progress % next to progress bar for each activity in "All Activities" page

This is an idea from our programming team, which they find it very useful if can directly know the progress of each activity, with the aid of filtering function and WBS, instead of going to another page like "Quantity Progress", which doesn't have...
Tat Man Leung 5 months ago in Perform / Program/Schedule Collaboration 0

SYNCHRO Field - Documents - search button

It would be great if we can have the search function for documents within SYNCHRO Field. We have a client who is about to upload approx. 100 pdfs per day in Control-documents, pdfs which will be opened by inspectors on site. Imagine someone on sit...
Alexandru Buzan over 3 years ago in SYNCHRO Control / Documents 4 Future consideration

Add Legend to Synchro Control Schedule-enabled saved views

Add a legend similar to 4D Pro that shows the appearance profiles in schedule-enabled iModel saved views.
Sarah Ruckhaus 5 months ago in SYNCHRO Control 0

Can Due Date on form be defaulted to TODAY()+X number of days?

By default can the due date be "X" number of days from the date the form was created?
Dan Sheldon over 1 year ago in Field / Forms | Forms 1 Will not implement

The Map Layers doesn't support weather

Would like to be able to see Radar and other map-related weather items as you can see in the Map view in Control. This is needed to attach to forms to show why a delay may have happened