Infrastructure Cloud - Help Link only Show ProjectWise Link
When we use Infrastructure Cloud Link, and open SYNHCRO project, the Short Cut Link in top Right (just before Profile) still show ProjectWise link. I think need to change to SYNCHRO if we are opening SYNCHRO Project.
How to determine which element of the model the task is assigned to?
By clicking on a task in the diagram, we see only the assignments of the task, but we do not understand which elements it is assigned to. Perhaps you should add the function of displaying only the elements assigned to the selected tasks (isolation...
Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.
Currently in synchro Control \ Schedule the animation is starting at the Project Start Date.
Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control
1
Future consideration
Could capabilities be added for using a 3d Connexion Spacemouse? Currently, I can only zoom in and out - no rotation. It seems this would only require communication with their software development department.
Add cost codes within modeler tree and have capability to export cost code configuration.
The default format of setting up a cost code configuration to attach to a model is too rigid. It is almost impossible to determine which codes will need to be incorporated for a design build project model. As designers update models more codes wil...
David Gallaher
over 1 year ago
in SYNCHRO Modeler
0
Future consideration
Ability to filter/select PDF settings plan sheets by user defined tags.
In the PDF Settings selection under administration in SYNCHRO control we only have the ability to filter by all sheets, published or draft. A document controller needs the ability to have more options available to view plan sheets in case modifica...