Would like to be able to see Radar and other map-related weather items as you can see in the Map view in Control. This is needed to attach to forms to show why a delay may have happened
Dan Sheldon
over 2 years ago
in Field / Forms | Forms
0
Future Consideration
Control transitions for roles with same permission
Sometimes even with the new functionality (in development) for permissions in state we will end up with roles that have same permissions. It will be useful to allow the AssignedTo and AssignedUsers properties to be conditions in transition as in I...
Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Currently you can filter with a time frame and the 3d view will adapt to it. user should be able to filter by human resource, material resource, equipment resource, and location resource. user should also be able to filter by work package descipli...
The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher
over 2 years ago
in SYNCHRO Modeler
0
Future consideration
It can be hard to select lines, items or layers in congested areas of the model. Especially when you have big ol construction fingers. It would be very helpful if the Cross-section selection tool was available on all views for easier model selecti...
Thomas Schimpf
over 2 years ago
in Field / Models | Tools
0
Future Consideration
To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.
As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Able to do Concatenate Some Bindings to a Target Binding
User want to have the function that able to Combine value from some different binding to another single Target Binding. Example to Combine generate single Document Number from different field.
Indrawan Wijaya
over 2 years ago
in SYNCHRO Control / Forms
0
Future consideration