Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1304

% Complete calculated consistenly with Physical Quantities

In SYNCHRO, despite is possible to calculate progress of leaf activites through Physical Quantitities, their "father" activities are still calculated by Duration (as their children progress is calculated by Automatic/Duration). % Complete of non-l...
Gabriele Barone 10 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Likely to implement

the Auto - Sent By column (same like Created By Column)

For the Form it is good to have the Sent By Column, to identify who is the previous user.
Indrawan Wijaya over 1 year ago in SYNCHRO Control / Forms 2 Will not implement

I would like the ability to add additional fields into the Field App View for Forms

I would like the ability to add additional fields into the Field App View for Forms. This option will allow us to be able to sort on a specific field in the field App.
David Dudek over 1 year ago in SYNCHRO Control / Field/Mobile 0

Implementation of a "split screen" feature within the Field app

have a "split screen" capability to see PDF document while keeping the view of the model, similar to what iPad can do.
Tony Bonacorsi over 1 year ago in Field / Models | Visibility 1 Future Consideration

Ability to change status of more than one form at a time

Having to manually turn each form from published to draft just takes too long
Guest over 3 years ago in SYNCHRO Control / Forms 2 Future consideration

Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.

Currently in synchro Control \ Schedule the animation is starting at the Project Start Date. Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas about 3 years ago in SYNCHRO Control 1 Future consideration

Data Visualization multiple search capabilites

Would like to have the ability to use advanced search parameters and multiple queries of model properties to refine data visualization searches.
Kerry Newbanks over 1 year ago in SYNCHRO Control / Civil Tools 1

Add legend of ActivityCode Values in Gantt while in 'Activity Code Color' Mode

We're using the activity code color model to define tasks for multiple companies. But it's not possible to add a legend to the Gantt to define the colors.Legend must be suitable to show both ACV and/or ACV Description
Bram Wildekamp over 1 year ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 1

Saved layouts for Usage Matrix

Ability to create, save and share layouts of the Usage Matrix
Luke Read over 1 year ago in Perform / Timesheets 0 Future Consideration

I want to be able to "attach" issues from the entire project to a plan set mark up, not just be limited it to the issues on the drawing.

No description provided
Beth Buerger 11 months ago in SYNCHRO Control / Plan Sets 1