The goal is to enhance Synchro Control's printout configuration by enabling the tool to automatically recognize and match fields configured in a PDF with the corresponding bindings in the form. This feature aims to significantly reduce the manual ...
To have 2D coming from a .sp file displayed in Synchro Control
User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
For modification to audit trails, we want a feature to view only the changes made to it, and not the entire content of the field/binding.This would help us to understand what the exact changes made to the form is and not just the entire content of...
Dashboards - to add customisation so that we can determine the property that the charts can be displayed
We hope to be able to customise the dashboards according to the properties and bindings that we require, as well as the ability to drill down, similar to Connect services dashboards
Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule
Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro.
These layouts must include :
- Schedule Tasks Group and Sort,
- Schedules tasks filters,
- Relevant Schedule Tasks Attrib...
Ability to maintain folder mapping for PDF export through Forms Workflow
If a PDF is set to auto-export at a specific folder location within Documents, using Forms > Workflow > Transition, that path is not maintained through provisioning to a production project.
users and project team have feedback that SYNCHRO Control iModel navigation is laggy and slow. please look into the matter so that the model can orbit and rotate smoother and faster.
Display the Resource Statuses in Synchro Control the same way than in Synchro™ 4D Pro
In Synchro™ 4D Pro it is possible to define several Resources Statuses and associate them to a Resource at a defined date. Then, if Color Mode of the 3D View is based on Resource Statuses, when moving the Timeline in the Gantt window of Synchro™ 4...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control / Models
0
Future consideration