Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

SYNCHRO Control

Showing 387

PDF Plan set upload from ProjectWise

I want to upload a file to plan sets from a ProjectWise folder using the PW connector
Bill McNamara over 3 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Have the ability to move widgets and tables to a second monitor

Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
Dan Sheldon 11 months ago in SYNCHRO Control / Models 0 Future consideration

To have the possibility in Synchro Control \ Schedule to display several 3D Windows based on different dates: current / baseline(s).

To be able to import in Synchro Control a Synchro 4D Pro .sp file which contains two or more 3D Windows. Different dates (i.e. current, baseline(s)) being used per 3D Window. To have all 3D Windows created in Synchro 4D Pro displayed in Synchro Co...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 0 Future consideration

Downloading folder and subfolders

When selecting a parent folder should i not get all the subfolders and files? Currently, when I select a folder from the document I'm only getting 1 folder and non of its subfolders and files
Dan Sheldon over 3 years ago in SYNCHRO Control / Documents 0 Future consideration

Site Diaries

A key part of construction is the maintenance of a site diary. It would be great if we were able to create site diaries which users can create and complete on a daily basis. Also have the ability to attach images to site diaries.
Guest about 5 years ago in SYNCHRO Control / Forms 0 Future consideration

Link existing Issues/Forms to Documents

It would be very useful to be able to link forms (RFI's, for instance) that are already created to a plan sheet or PDF document. Right now, the only way to connect PDFs with forms is by creating the form from the document, but you cannot link it o...
Rafael Ramirez Vizuete 10 months ago in SYNCHRO Control / PDF Markup 1 Future consideration

Private and Public markups

As a Construction Documentation management software, there should be a differentiation between public and private markups. As of now, any project member can markup any document, including plan sets, and those markups would be seen by everybody els...
Rafael Ramirez Vizuete 10 months ago in SYNCHRO Control / PDF Markup 0 Future consideration

Escalate form to have an option to include attachments or not

When escalating the form from one to another, can we please have an option to whether the escalation will include the attachments or not from the previous form to the next form? This is important when the user access between the two forms are diff...
Guest over 1 year ago in SYNCHRO Control 0 Future consideration

Plan Revision Notifications

Notify users through e-mail when plan revisions are published.
David Gallaher over 1 year ago in SYNCHRO Control / Plan Sets 0 Future consideration

Math Function for Date time and Date

If we can do more calculation for the DateTime and Date component. Example: Get the Duration between two date or date time. the duration will be number, can be set as day our hour or minute. Can add a Date component with number box component. Righ...
Indrawan Gmail almost 2 years ago in SYNCHRO Control / Forms 0 Future consideration