PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1323

Additional Weather Parameters

I would like the weather widget to capture additional weather parameters, such as Humidity, Visibility, Precipitation Amount and Wind Direction.
Guest over 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Enable Bulk upload of Forms to edit existing form instances.

For owner/operators, edit the form instances in the csv file for multiple forms then upload the changes into Control for tracking. Suppliers not willing or able to access forms in web portal, send data via other apps. an owner/operator would have ...
Kerry Newbanks 6 months ago in SYNCHRO Control / Forms 0 Unlikely to implement

UI improvements: Project Start/Finish date and progress

Create a UI to select a start and end date for a project when creating it, and allow project parties to see the progress of the current project on the home screen.
HoSang Jeon 6 months ago in SYNCHRO Control 0 Future consideration

Status Visualization color control options

The ability to have wider options for selecting color control within status visualization. Standard and custom colors with an eyedropper option to select a color from the screen.
Jonathan Cunningham over 1 year ago in SYNCHRO Control / Model Viewer 0

Ability to change status of more than one form at a time

Having to manually turn each form from published to draft just takes too long
Guest almost 4 years ago in SYNCHRO Control / Forms 2 Future consideration

Ability to change Status of all Related Forms in bulk

Eg, if there was an observation created, which was escalated to an Issue, which became part of a Change Order (in SYNCHRO Cost), and once the change order is accepted/ closed, the user should get the option to apply a similar status of all the rel...
Arpit Prakash almost 2 years ago in SYNCHRO Control / Forms 0

To apply to the 3D Window of Synchro Control \ Schedule the same 3D Filters than the one(s) activated at the time of the upload of the .sp file.

As an example, User would like to filter all 3D Objects not assigned to a Schedule Task (through corresponding Material Resources) prior to share the .sp file with stakeholders of the project through Synchro Control \ Schedule, so that unmapped 3D...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.

Currently in synchro Control \ Schedule the animation is starting at the Project Start Date. Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas over 3 years ago in SYNCHRO Control 1 Future consideration

SYNCHRO Field - Documents - search button

It would be great if we can have the search function for documents within SYNCHRO Field. We have a client who is about to upload approx. 100 pdfs per day in Control-documents, pdfs which will be opened by inspectors on site. Imagine someone on sit...
Alexandru Buzan almost 4 years ago in SYNCHRO Control / Documents 4 Future consideration

Ability to easily select Objects that have been split in Modeler

It's easy to turn off all the split elements as its shown in its own tree hierarchy under Construction Data, however, there's no easy way to identify the original elements. By default both of them are visible in Control, overlapping each other. Si...