Pinned ideas

View all
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1312

Export Excel - make the ID column have hyperlinks

Excel Export Register should contain the hyperlinks in the ID column
Guest over 3 years ago in SYNCHRO Control / Forms / Inspection 0 Future consideration

Model view - Don't show Work Assigned panel in Model View for Guest Users

When a Guest User logs into construction.bentley.com to view the 4D model they have to click on the Model icon in the top right corner to load up the 4D model. When the model loads up, the bottom half of their screen shows a panel that lists out w...
Ruth Fuller over 1 year ago in SYNCHRO Control 0

Ability to change Status of all Related Forms in bulk

Eg, if there was an observation created, which was escalated to an Issue, which became part of a Change Order (in SYNCHRO Cost), and once the change order is accepted/ closed, the user should get the option to apply a similar status of all the rel...
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

provide option for Comment on Rejection in transition

Provide ability to set mandatory comment on Rejection in transition. Generally the Rejection needs to be justified and provide guidance for the reason and may be how to achieve approval. Currently the form just stays in the status with no notifica...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Planned

Any user field attributes from 4D Pro or Modeler are not visible in Control

Synchro Control model do not show any user field attributes added from 4D Pro or from Modeler. These attributes must be visible.
Manoj Jamma over 3 years ago in SYNCHRO Control / Models 0 Future consideration

Filter tasks using Activity Codes

Filter Schedule by Activity Code
Joe Griffiths 5 months ago in SYNCHRO Control / Schedule 0

Additional Features Synchro Control - Power Bi plug in

Hey, I was testing out the Synchro Control - Power Bi plug in and ran into a little issue. Not all the information I wanted was getting exported and some data I wasn't interested in was. Is it possible to add in a feature so we can determine which...
alex van belleghem over 2 years ago in SYNCHRO Control / APIs 0

Ability to use Baseline Dates for EVA Graph and Resource Utilization Graph

Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Util...
Sourav Kumar 5 months ago in SYNCHRO 4D Pro / Animations 0

How to determine which element of the model the task is assigned to?

By clicking on a task in the diagram, we see only the assignments of the task, but we do not understand which elements it is assigned to. Perhaps you should add the function of displaying only the elements assigned to the selected tasks (isolation...
Guest about 4 years ago in SYNCHRO Modeler 0 Planned

Mapped Master Dataset for forms

Would like to see a Master dataset hosted via Excel spreadsheet (or similar) that contains all Master data for a Control project and specifically the information commonly referenced via dropdown lists and pick lists on custom forms. Suggested that...
Matthew Blake over 2 years ago in SYNCHRO Control / Forms 0 Future consideration