Calendar of non working days

Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Rocky Ursino 10 months ago in Perform / Reports 1

Distribution of resource statuses according to the role to which it is assigned

To set restrictions on the choice of specific groups of resource statuses by the user's role
Владислав Веретенников over 3 years ago in SYNCHRO Control / Admin 4 Future consideration

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya 10 months ago in SYNCHRO Control / APIs 0

Status Visualization color control options

The ability to have wider options for selecting color control within status visualization. Standard and custom colors with an eyedropper option to select a color from the screen.
Jonathan Cunningham about 1 year ago in SYNCHRO Control / Model Viewer 0

Custom layout shown even if the workflow is closed

It will be more efficient if the custom printout or design form layout is shown even if the workflow is closed. This prevents the people from downloading/exporting the form just to see the information inside.
Kimberly Nazareth Angeles about 2 years ago in SYNCHRO Control / Forms 1 Future consideration

Able to progressing for Resource Group to Task

Right now, Field only can do progressing if the Resource directly link to Task, progressing is not working if we link resource group to task. In Pro, sometime we need to link resource group to task for better grow simulation. Need to improve Field...
Indrawan Wijaya almost 4 years ago in Field / Status update | Resources 1 Planned

Filter tasks using Activity Codes

Filter Schedule by Activity Code
Joe Griffiths 5 months ago in SYNCHRO Control / Schedule 0

We want the option to be able to delete FORMS on our own that have been published and filled out.

On the Forms we create for our organization we should have more control of what we can do with our Forms. We would like to be able to delete obsolete forms or move into "Recycle Bin".
David Dudek Jr. almost 3 years ago in SYNCHRO Control / Forms 1 Future consideration

Data Grid - with formula

We want to add formula inside the data grid, so it can do calculation, example the Total Price, it will have value: Quantity * Unit Price. Please see attachment.
Indrawan Wijaya almost 3 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to use Baseline Dates for EVA Graph and Resource Utilization Graph

Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Util...
Sourav Kumar 5 months ago in SYNCHRO 4D Pro / Animations 0