PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1308

Project creation through the API

When creating a project using the ITwin API that project is not visible in SYNCHRO Control. Project creation through the Projects API was a request they made when the Projects API was being migrated into the iTwin API and never responded too.
Russ Campton 10 months ago in SYNCHRO Control / APIs 0

Ability to automatically create a Form by uploading an existing fillable pdf

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Planned

Filter tasks using Activity Codes

Filter Schedule by Activity Code
Joe Griffiths 5 months ago in SYNCHRO Control / Schedule 0

Copy flow between forms

Ability to model a flow and copy it it into a new unique (custom) form to be further customised. This will save a lot of time in multistage complex flows which are very similar. Currently a flow can be shared within the form type but cannot be cus...
Kiril Tasev over 2 years ago in SYNCHRO Control / Forms 0 Planned

Calendar of non working days

Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Rocky Ursino 10 months ago in Perform / Reports 1

Ability to use Baseline Dates for EVA Graph and Resource Utilization Graph

Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Util...
Sourav Kumar 5 months ago in SYNCHRO 4D Pro / Animations 0

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya 10 months ago in SYNCHRO Control / APIs 0

Add selection tool (draw rectangular)for statusing

Requested by Patryk Makowski <p.makowski@cmteam.net> Please add selection tool (like "By rectangular") to enable selecting/unselecting multiple elements at once, without selecting them all, while we're in statusing mode. They want to upt sta...
Daria Kosmala almost 3 years ago in Field / Status update | Resources 6 Future Consideration

Integrate Rules of Credit into mobile app (properly)

Currently the rules of credit progress update interface is an 'iwindow'(?) which completely crashes when opened in the windows app.It is currently only available as an add-on you need to request. It is already a tabbed viewer, it doesnt make any s...
Rick Winsor 5 months ago in Perform / SYNCHRO Perform Mobile 0

Roll up progress/costs to WBS parents

Currently there is no relation between tasks and their subtask, even in rules of credit, you could have all subtasks at 100% but the parent still sits at 0% as a manual input.
Rick Winsor 5 months ago in Perform / Progress Measurement 0