Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1304

To have the possibility in Synchro Control \ Schedule to display several 3D Windows based on different dates: current / baseline(s).

To be able to import in Synchro Control a Synchro 4D Pro .sp file which contains two or more 3D Windows. Different dates (i.e. current, baseline(s)) being used per 3D Window. To have all 3D Windows created in Synchro 4D Pro displayed in Synchro Co...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 0 Future consideration

4D Planned Vs Actual window Dashboard in Control

the 4D Planned Vs Actual scenario comparison should be visible in SYNCHRO control . It will boost the management review also that they may refer issues dashboard , power BI dashboard and Planned Vs actual delay analysis within the same browser its...
Prateek Singh over 2 years ago in SYNCHRO Control / Reports 0

SMU in Matrix

We have start and finish time in Matrix. For plant, could we have start and finish SMU in Matrix
Nageshwar Sesetti over 2 years ago in Perform / Timesheets 1 Future Consideration

Stamp a PDF with a custom stamp via a Web Services API call

(MUST) As a Bentley developer I want to be able to stamp a PDF file with an image/text via a Web Service API call using PDFTron (Apryse). (MUST) As a Bentley developer I want to be able to specify the location of the stamp to allow for positioning...
Paul Houghton 8 months ago in SYNCHRO Control / APIs 0 Already exists

Calendar of non working days

Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Rocky Ursino 8 months ago in Perform / Reports 1

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya 9 months ago in SYNCHRO Control / APIs 0

Easier Location of equipment using synchro field

In a big site where you have thousands of supports, piping and cabinets in various floors, It is practically difficult locating installed equipment on site. as the equipment are only liked via schedule, because everything is greyed out, you don't ...
Gareth Odiakose 4 months ago in Field / Status update | Tasks 0

Hide or Rename a Marked up PDF file with a .xfdf extension.

It would be helpful if SYNCHRO could Hide or Rename a Marked up PDF file to show it is marked up so that confusion is not created. Right now the file just get a new Extension of a .xfdf.
David Dudek Jr. over 1 year ago in SYNCHRO Control 2

Performance issue with Synchro 4D for big models

I am trying to perform 4D animation for 530MB nwd file and having lot of problems while navigating model in Synchro 4D. Synchro 4D always shows its on low memory. My machine has good configuration but till having this issue.
Hemant Suryavanshi almost 2 years ago in SYNCHRO 4D Pro / Animations 1 Will not implement

Civil report showing Offset/Elevation from the Template Points

Get a report showing the Template Points in the corridor that show the Offset/Elevation Example of a similar report from OpenRoads is attached.
Dan Sheldon over 1 year ago in SYNCHRO Control / Civil Tools 0 Future consideration