Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1301

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 1 Future consideration

Link the schedule to user-created issue forms.

Users want to know which Tasks the issues they need to work on are related to so they can track their progress.
HoSang Jeon 7 months ago in SYNCHRO Control / Schedule 0

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas about 3 years ago in SYNCHRO Control / Models 1 Future consideration

Delete Bindings

Want the ability to Delete a Binding(s) that are unused and unassigned on FORM Definitions
Derryl Acosta over 3 years ago in SYNCHRO Control / Forms 2 Planned

IFC Export

Hi the IFC export is very limitign: Only ifc 2x3 can be exported The PropertySets disappear and the ObjectTypes are not exported in the right way. I kindly ask you, to improve the IFC export as this file format is very popular and regularly used f...
Manuel Kraehenbuehl over 1 year ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Delete or archive project templates

Organization admins may create multiple project templates and determine that some, or many, should be deleted or archived due to changing template needs. An admin should have the ability to select from a list of the project templates any that shou...
Ryan Posnikoff almost 2 years ago in SYNCHRO Control / Admin 1 Planned

Support to bulk upload Rates in Perform

Current method of loading and updating rates individually into Perform needs the ability to bulk create and needs to include notation to allow information on source
Ernest Downes over 2 years ago in Perform / Dockets 0 Future Consideration

Digital Signature service workflow improvement

Currently, a user who needs a digital signed document must use a signature service, such as Docusign, to start the process, export the document, email,/share document with owner, contractor. Owner/Contractor must download certified document, uploa...
Kerry Newbanks 4 months ago in SYNCHRO Control / Forms 0

Search within the model for element by name

Users often face difficulty in finding specific elements within a complex model due to the large number of elements present. Thus, they need a way to search for elements within the model by using a text-based search. If such a feature is available...
Jonathan Cunningham 11 months ago in Field / Models / Models | Display / Models | Tools / Models | Views / Models | Visibility 0 Planned

Add button File Upload in the Form

At the moment, it is not possible to add the 'File Upload' button to forms; only a button with 'Add Attachment' appears at the end of the forms. The introduction of this button would be quite useful, even for multiple additions, because in this wa...
Joana Isabel Neves Gomes 11 months ago in SYNCHRO Control / Forms 1