Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1298

Simulation with percent complete number base on Focus Time

in Task list in Gantt, ability to show the task plan percent complete simulation base on the Focus Time.
Indrawan Wijaya 3 months ago in SYNCHRO 4D Pro / Animations 1

Resource Status Playback

SYNCHRO field to able to do Resource Status Playback
Indrawan Gmail almost 2 years ago in Field / Status update | Resources 1 Future Consideration

Search within the model for element by name

Users often face difficulty in finding specific elements within a complex model due to the large number of elements present. Thus, they need a way to search for elements within the model by using a text-based search. If such a feature is available...
Jonathan Cunningham 9 months ago in Field / Models / Models | Display / Models | Tools / Models | Views / Models | Visibility 0 Planned

Stamp a PDF with a custom stamp via a Web Services API call

(MUST) As a Bentley developer I want to be able to stamp a PDF file with an image/text via a Web Service API call using PDFTron (Apryse). (MUST) As a Bentley developer I want to be able to specify the location of the stamp to allow for positioning...
Paul Houghton 6 months ago in SYNCHRO Control / APIs 0

PDF Markup Offline in Field

Need to be able to Markup PDF's in Field app in offline mode. Don't need all the tools but to be able to do basic markups and SYNC back to cloud once back online.
Dan Sheldon over 3 years ago in Field / Documents | Documents 0 Planned

Escalate form to have an option to include attachments or not

When escalating the form from one to another, can we please have an option to whether the escalation will include the attachments or not from the previous form to the next form? This is important when the user access between the two forms are diff...
Guest about 2 years ago in SYNCHRO Control 0 Future consideration

Calendar of non working days

Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Rocky Ursino 6 months ago in Perform / Reports 1

Plan Revision Notifications

Notify users through e-mail when plan revisions are published.
David Gallaher about 2 years ago in SYNCHRO Control / Plan Sets 0 Future consideration

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya 6 months ago in SYNCHRO Control / APIs 0

Add button File Upload in the Form

At the moment, it is not possible to add the 'File Upload' button to forms; only a button with 'Add Attachment' appears at the end of the forms. The introduction of this button would be quite useful, even for multiple additions, because in this wa...
Joana Neves Gomes 10 months ago in SYNCHRO Control / Forms 1