Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1139 of 1139

Ability to bulk update Document Folder Access

Currently, the way this is set up is to remove access for one Role, all other Roles need to be given access, by manually checking on each. If we had a bulk update option, it will be easier to simply remove the restricted users.
Arpit Prakash 11 months ago in SYNCHRO Control / Documents 0 Future consideration

Delete or reassign multiple costs at one time

Current way to delete cost code is by a single element. Need the capability to reassign multiple or delete to maximum time. It would be frustrating to delete and then reassign codes if there are thousands of elements.
David Gallaher about 1 year ago in SYNCHRO Modeler 0 Future consideration

NOT to separate 3D objects to cells when exporting to .spx by Plug-in for Micrpstation or importing straght i.dgn/bim to Synchro

It's very unproductive when all compound 3D objects separate to cell after exporting to .spx by Plug-in for Microstation or importing straght i.dgn/bim to Synchro. And any cell doesn't inherit properties (user fields) from compound 3D object It's ...
Дмитрий Павлович Сергеев over 2 years ago in SYNCHRO 4D Pro / Import/Export 2 Future consideration

To select all elements in custom group of 3D objects when click on the group name

Why when I've made a custom group (grouping by User Field) of 3D objects and try to select all elements by clicking on the group name they don't select? I think it have to work, please fix it.
Дмитрий Павлович Сергеев over 2 years ago in SYNCHRO 4D Pro / Filters/Tables 0 Future consideration

NOT to export nested families as a separate elements from Revit

There is a function in general settings of Plug-In for Revit: Export nested families as a separate elements. But it doesn't work, when untick it still export export nested families as a separate elements. Please, fix it and add the same function t...
Дмитрий Павлович Сергеев over 2 years ago in SYNCHRO 4D Pro / Microstation/Revit/Navisworks Plugins 0 Planned

Changing Baselines, export Baselines from P6 to Synchro

It would be very helpfull to add the ability to change the Baseline dates at any time we need. Just to click to baseline date cell and change it; or export to excel, change there and import back to Synchro. And if you still cannot currently import...
Дмитрий Павлович Сергеев over 2 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 2 Future consideration

Cross section selection tool on other views

It can be hard to select lines, items or layers in congested areas of the model. Especially when you have big ol construction fingers. It would be very helpful if the Cross-section selection tool was available on all views for easier model selecti...
Thomas Schimpf about 1 year ago in SYNCHRO Field / Models | Tools 0 Future Consideration

Functionality for User Fields when using iModel connectors

When a 3D model is imported directly into a Synchro Control project within the Synchro 4D Pro application (using File > Import), it is possible to create user fields. For example, I could import a 3D model and then I could set up a User Field c...
Ruth Fuller 11 months ago in SYNCHRO Control / Models 0

Work Area Tool Start Location should have option to use project stationing

Right now the tool always starts at zero, however, this may not be the desired project stationing. Eg. Start Station property is 499+99.1 in the following Alignment - It would be ideal to give users the choice.
Arpit Prakash 11 months ago in SYNCHRO Modeler 0 Needs review

Ability to change Status of all Related Forms in bulk

Eg, if there was an observation created, which was escalated to an Issue, which became part of a Change Order (in SYNCHRO Cost), and once the change order is accepted/ closed, the user should get the option to apply a similar status of all the rel...
Arpit Prakash 11 months ago in SYNCHRO Control 0