When creating a project using the ITwin API that project is not visible in SYNCHRO Control. Project creation through the Projects API was a request they made when the Projects API was being migrated into the iTwin API and never responded too.
Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Currently unavailable but desperately needed: Ability to create Build iTwin project using API where a project per subcontractor model is adopted to allow rapid deployment
In the "Manage your Team" area of Synchro Control, I usually use the "old layout" and click on Import users. This allows me to bulk import users by uploading a csv file. I can then untick a box which says "Send project invitation email to import p...
I want to update inspection form status for multiple forms at a time
As a user, when I select more than one inspection form in Admin/Manage Forms/Inspections, the Change Status and Delete buttons grey out. I'd like to be able to change the status of multiple forms at the same time.
Hi Team, it is feedback from number of users who wants to see if we can have 2 things added in cost analytics. 1. Saving our own template 2. Downloading the data gathered using various fields in Cost Analytics
Hi, It would be very useful if we can save under a Saved View the hidden objects. So basically I hide 3D objects to clear/isolate areas within the model, then I want to save the view and reuse it in future.