Capability to extract the list users and their roles across all projects

For Acct reviews and stocktaking of all the roles and users across all projects.
Guest almost 5 years ago in SYNCHRO Control / Admin 0 Planned

Synchro Forms please add signature Component within Grid Control

Please provide the ability to add signatures within the grid box
Keith Anthon almost 3 years ago in SYNCHRO Control 0 Will not implement

Project creation through the API

When creating a project using the ITwin API that project is not visible in SYNCHRO Control. Project creation through the Projects API was a request they made when the Projects API was being migrated into the iTwin API and never responded too.
Russ Campton over 1 year ago in SYNCHRO Control / APIs 0

Resource Status - Update percentage base of quantity

If a task is planned for 10 days to pour 100 cubic meters of concrete. The user would like to be able to update the quantity (cubic meters) using the Field app - Status update
Paolomee Udani about 4 years ago in SYNCHRO Field / Status update | Resources 0 Planned

Option to Delete Multiple Attachments from a Form

It would be helpful to have the option of Deleting Multiple Attachments from a Form filled out rather than one at a time. There are times we have a lot of attachments on a form we escalated and need to delete all the attached documents from the form.
David Dudek Jr. almost 3 years ago in SYNCHRO Control 0 Planned

Calendar of non working days

Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
Rocky Ursino over 1 year ago in SYNCHRO Perform / Reports 1 Future Consideration

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya over 1 year ago in SYNCHRO Control / APIs 0

Project filtering by filters or activity codes

the goal is to filter the 4D view to today's or next week's work for the specific role based user viewing the 4D model, pref. based on activity codes, 3D or tasks filters (like SITE used to have!)
Joost Wijnen over 4 years ago in SYNCHRO Field / Models | Display 0 Future Consideration

I want to update inspection form status for multiple forms at a time

As a user, when I select more than one inspection form in Admin/Manage Forms/Inspections, the Change Status and Delete buttons grey out. I'd like to be able to change the status of multiple forms at the same time.
Mariano Colicchio over 1 year ago in SYNCHRO Control / Inspection 0 Future consideration

Add Company Filter to the Resource Usages For Import

Can we add a Company Filter to the 'Resource Usages For Import', this will be helpful to allow us to export hours entered by subcontractor companies.
Duncan Turner about 2 years ago in SYNCHRO Perform / Timesheets 1 Future Consideration