When creating a project using the ITwin API that project is not visible in SYNCHRO Control. Project creation through the Projects API was a request they made when the Projects API was being migrated into the iTwin API and never responded too.
Resource Status - Update percentage base of quantity
If a task is planned for 10 days to pour 100 cubic meters of concrete. The user would like to be able to update the quantity (cubic meters) using the Field app - Status update
It would be helpful to have the option of Deleting Multiple Attachments from a Form filled out rather than one at a time. There are times we have a lot of attachments on a form we escalated and need to delete all the attached documents from the form.
David Dudek Jr.
almost 3 years ago
in SYNCHRO Control
0
Planned
Include a calendar setting - whereby we can include non-working days such as PO's/RDO/etc. So that planned weekly charts do show no planned works for these days.
The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
the goal is to filter the 4D view to today's or next week's work for the specific role based user viewing the 4D model, pref. based on activity codes, 3D or tasks filters (like SITE used to have!)
I want to update inspection form status for multiple forms at a time
As a user, when I select more than one inspection form in Admin/Manage Forms/Inspections, the Change Status and Delete buttons grey out. I'd like to be able to change the status of multiple forms at the same time.