Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

SYNCHRO Control

Showing 778

Ability to push Form/Inspection definition updates from a template project to production projects

Currently, we have to go to each production project and reprovision them to get the latest updates from the template. It would be ideal to push the updates directly from the template project to all production projects, selected through a list.
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 1 Planned

Add a georeferenced image file to replace default satellite image

The default satellite images in the Forms are quite out of date. It would be good to be able to incorporate a georeferenced image file into the map to overlay or replace the existing satellite image. We collect these using UAVs at our construction...
Sheila Bjerreskov about 1 month ago in SYNCHRO Control / Maps 0

Provide Form preview in all statuses

Provide Form preview in all statuses. Currently only the controls available in initial status are shown. Provide ability to mimic the Form transitioning into other statuses. This will greatly enhance the development of complex forms with scripts w...
Kiril Tasev about 1 month ago in SYNCHRO Control / Forms 0

Enable a project to be at draft status

When reprovisioning a project or setting a new project we need to create roles and invite users. ALso we need to set forms as Published and get the project ready for use. People will get notifications and will be able to access the project at that...
Kiril Tasev about 1 month ago in SYNCHRO Control / Forms 0

Add a Data Center in Latin America

For South American countries, the closest Data Center is East US. The incorporation of a Data Center for this region is urgently needed (Azure has a Data Center in Brazil, right?), since the collaborative work based on the SYNCHRO Control cloud pr...
Jean Delgadillo over 1 year ago in SYNCHRO Control / Admin 1

Provide "Project Owner" column in project list

Provide "Project Owner" column in project list. This will allow better visibility, management and filtering of Projects.
Kiril Tasev 3 months ago in SYNCHRO Control 0

Contractor RFI Usage

It would be ideal be able to select the contract package and RFI is associated with. IE: SC01 - Civil Site, SC02 - Foundations, SC03 - Electrical, and on the RFI number it could be auto numbered as RFI-SC01-0001, RFI-SC02-0001. Allowing Contractor...
Guest over 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Ability to bulk upload Actions/Scripts through Excel

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms / Inspection 0 Planned

Add the ability to create schedules for many models of one SynchroControl project.

Currently only one SynchroControl project model can be configured for the scheduling service ("Set up this iModel for scheduling service"). When a project is large in size or diligent, it is more convenient to split it into several models. Moreove...
Guest about 4 years ago in SYNCHRO Control / Admin 0 Future consideration

To have 2D coming from a .sp file displayed in Synchro Control

User has loaded in Synchro™ 4D Pro a 2D .dwg drawing to create the 4D animation. Once uploaded in Synchro Control the lines coming from the 2D .dwg model are not visible from the Schedule functionality of Synchro Control. If the same 2D .dwg is us...
Thibault Dumas about 2 years ago in SYNCHRO Control / Models 7 Future consideration