Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1303

Form PDF exported through Transition creates a folder structure regardless of not containing Attachments

The following settings always create a folder structure containing an empty Attachments folder. When manually exporting from the Grid, it exports just PDF if no Attachments are available -
Arpit Prakash 6 months ago in SYNCHRO Control / Forms 0

Reality data in Synchro Field app

It would be a great use case if engineers can view the reality data photogrammetry in the Synchro Field app similar to Synchro Control
Janaki Sundaram 9 months ago in Field / Models | Views 0 Future Consideration

Filter tasks using Activity Codes

Filter Schedule by Activity Code
Joe Griffiths 3 months ago in SYNCHRO Control / Schedule 0

Ability to link to a specific sheet within Plan Set or Specifications

No description provided
Arpit Prakash 6 months ago in SYNCHRO Control / Plan Sets 0

Disable permissions that are not relevant to Access

For example, if a Role only has Field access, the rest of the permissions that do not correspond to it, like Admin, should be greyed out -
Arpit Prakash over 1 year ago in SYNCHRO Control / Admin 0 Future consideration

Show PDF page break on forms designer

It would be really helpful if the Forms Designer had a page break indicator for a standard 8 1/2 by 11 page
Sarah Albee 9 months ago in SYNCHRO Control / Forms 0

Ability to select Control by Binding Name

No description provided
Arpit Prakash 9 months ago in SYNCHRO Control / Forms 0

Ability to use Baseline Dates for EVA Graph and Resource Utilization Graph

Hi everyone, Our 4D Animations from Synchro 4D Pro are created as Baseline Dates vs Actual Dates. There is an option to set the dates for 3D Windows in the 3D View Properties Tab, but the same option is not avaiable for EVA Graph and Resource Util...
Sourav Kumar 3 months ago in SYNCHRO 4D Pro / Animations 0

Add hyperlink to navigate between PDF

Request is to have some of the standard section symbol recognize and convert to hyperlink to navigate to the associate pdf displaying the section ( reference Smartuse » https://www.smartuse.com/ Hyperlinkhttps://www.youtube.com/watch?v=74uCuOS_wE0...
Luc Poulin 9 months ago in SYNCHRO Control / Plan Sets 0

Signature Overwrite Setting

The signature component now is only one time used. In many workflow, there are send back process, and the user need to sign again for the second time. For this type of workflow, Need to able to make the signature component empty again and can be u...
Indrawan Wijaya almost 2 years ago in SYNCHRO Control / Forms 0 Planned