PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED I would like media Indexing to remember my Search preference like this week or Month instead of today
No description provided

All ideas

Showing 1323

Make a better customer support. Try to reach multiple times

No description provided
AMITH MOHAN 11 months ago in Perform 0

To have the possibility to define a look-ahead filter for the Gantt window accessible from Synchro Control \ Schedule

Currently all Schedule Tasks within the Synchro 4D Pro .sp file are displayed in the Gantt Window accessible from Synchro Control \ Schedule. As we can have several thousands of Activities, it will be difficult for User to understand which are th...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Math Function in Data Grid

It is good if the Math function is available inside the data grid component. Also with Total row.
Indrawan Gmail over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Switch between Element and Alignment in Field app (Station Offset Tool)

It would be helpful to have the option to switch between element and alignment while using the station offset tool in the field app (Similar to Control - see attached)
Thomas Schimpf about 2 years ago in Field / Models | Tools 0 Future Consideration

Disable permissions that are not relevant to Access

For example, if a Role only has Field access, the rest of the permissions that do not correspond to it, like Admin, should be greyed out -
Arpit Prakash almost 2 years ago in SYNCHRO Control / Admin 0 Future consideration

Display Resources Tree in Synchro Control \ Schedule

To have the possibility to access in Synchro Control \ Schedule the Resources Tree as defined in Synchro Pro. With possibility, in Synchro Control \ Schedule, to navigate between Resources window, 3D window and Gantt window the same way than in Sy...
Thibault Dumas over 3 years ago in SYNCHRO Control / Models 1 Future consideration

Delete Bindings

Want the ability to Delete a Binding(s) that are unused and unassigned on FORM Definitions
Derryl Acosta over 3 years ago in SYNCHRO Control / Forms 2 Planned

Filter form status in Schedule view

When managing form with multiple instances it is necessary to be able to filter out some of the statuses and work on the rest. i.e. in attached to filter out the backlog, not suitable and rejected and just leave the live instances. Either by allow...
Kiril Tasev 4 months ago in SYNCHRO Control / Forms 0

Add some kind of functions to provide evidence for contractor endorsement in reports

Refer to Bentley support case CS0280359 (attached file) or below: Knowing that the design rational for "Reports" module from support, which the report generated and submitted by one party (e.g. contractor) will be reviewed and approved by another ...
Tat Man Leung 8 months ago in Perform / Daily Diary & Reports 0

Escalate form to have an option to include attachments or not

When escalating the form from one to another, can we please have an option to whether the escalation will include the attachments or not from the previous form to the next form? This is important when the user access between the two forms are diff...