Additional Features Synchro Control - Power Bi plug in
Hey, I was testing out the Synchro Control - Power Bi plug in and ran into a little issue. Not all the information I wanted was getting exported and some data I wasn't interested in was. Is it possible to add in a feature so we can determine which...
Would like to see a Master dataset hosted via Excel spreadsheet (or similar) that contains all Master data for a Control project and specifically the information commonly referenced via dropdown lists and pick lists on custom forms. Suggested that...
Matthew Blake
about 3 years ago
in SYNCHRO Control / Forms
0
Future consideration
It would be great if we can have the search function for documents within SYNCHRO Field. We have a client who is about to upload approx. 100 pdfs per day in Control-documents, pdfs which will be opened by inspectors on site. Imagine someone on sit...
To apply to the 3D Window of Synchro Control \ Schedule the same 3D Filters than the one(s) activated at the time of the upload of the .sp file.
As an example, User would like to filter all 3D Objects not assigned to a Schedule Task (through corresponding Material Resources) prior to share the .sp file with stakeholders of the project through Synchro Control \ Schedule, so that unmapped 3D...
Possibility for Administrator to define a default predefined playback review period for Synchro Control \ Schedule.
Currently in synchro Control \ Schedule the animation is starting at the Project Start Date.
Meaning that if the entire EPC schedule has been imported and only the Construction phase is animated (i.e. has been mapped to the 3D Model), User will h...
Thibault Dumas
over 3 years ago
in SYNCHRO Control
1
Future consideration
Ability to easily select Objects that have been split in Modeler
It's easy to turn off all the split elements as its shown in its own tree hierarchy under Construction Data, however, there's no easy way to identify the original elements. By default both of them are visible in Control, overlapping each other. Si...