Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1342

Ability to map a Survey control to Radio group in a fillable PDF

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0

Ability to set Cascading list within a Grid control

Also, if there's only one option in a cascaded list, it should automatically get populated.
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0

Ability to Tag members in the Comments

It would be great if you could Tag members in comments which would trigger a notification, and discussion
Kevin Vivien almost 4 years ago in SYNCHRO Control / Forms 2 Future consideration

Ability to reprovision (update) Inspections from a template to production projects

We can only provision Inspections once (initial provision only), but cannot reprovision to get updates from the template project, unlike regular Forms.
Arpit Prakash over 1 year ago in SYNCHRO Control / Inspection 0

Return Actual Cost to Work Inspector/Progress webpage

I note the New/Enhanced Feature for SYNCHRO Perform removed "Actual Cost" from the Progress page of the Work Inspector in 9-Jun-2024 update. This page reports "Revised Earned Cost" which is linked to the actual progress. This information is most u...
Ernest Downes over 1 year ago in EVM (Perform) / Progress Measurement 0 Already exists

Math Function for Date time and Date

If we can do more calculation for the DateTime and Date component. Example: Get the Duration between two date or date time. the duration will be number, can be set as day our hour or minute. Can add a Date component with number box component. Righ...
Indrawan Gmail about 3 years ago in SYNCHRO Control / Forms 0 Future consideration

PDF Markup Offline in Field

Need to be able to Markup PDF's in Field app in offline mode. Don't need all the tools but to be able to do basic markups and SYNC back to cloud once back online.
Dan Sheldon over 4 years ago in Field / Documents | Documents 0 Planned

Include 3D Filters in Excel Export/Import

Please consider adding the 3D Filters as objects that can be exported to Excel file. This improvement will allow the users to configure the 3D filters within the excel spreadsheet, and then to import them in SYNCHRO 4D Pro, reducing the time spent...
Alexandru Buzan 8 months ago in SYNCHRO 4D Pro / Import/Export 0

When using the Station/Offset tool keep measuring until done

Right now when using the Station/Offset tool you have to pick the alignment after every time you use it. It should just keep letting me snap Station and Offsets down the alignment until I'm done.
Dan Sheldon over 2 years ago in Field / Models | Tools 0 Future Consideration

Keep "Alerts" Populated

It would be a HUGE quality of life upgrade if Alerts did not disappear when something is changed in the schedule. We work down through that list of alerts to ensure our "Schedule Log" is clean and after every "fix" it disappears. If the behavior c...
Thomas Whiteley 8 months ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration