PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 211

Show QR Code in thumb nail view in PDF settings

Currently we do not have the capability to place a QR code on multiple sheets at one time. It would be useful when doing QC on published sheets if a QR code has been placed in the thumb nail view without clicking on the panel icon.
David Gallaher almost 2 years ago in SYNCHRO Control / Plan Sets 4 Shipped

Add ability to select a control to be hidden in the design manager similar to Required or Read Only

Often when doing scripts a number box is used as a counter to switch between 1, 2, 3 or other value that can be used in the script to perform conditional actions. It would be beneficial to have a property that can mark the control to be hidden whe...
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Shipped

Form scripts If..Else clause

Quite often we design binary actions where we need to create two different scripts to achieve a If..Else structure. Please, add option for If..Else construct. Case: Currently: Trigger: Binding "ChangeA" Condition: if binding "ChangeA" is True Type...
Kiril Tasev almost 2 years ago in SYNCHRO Control / Forms 0 Shipped

Copy existing scripts

Some forms require repetitive scripts which currently need to be created one by one. Ability to copy existing scripts will save a lot of time when setting up a form that has multiple reveal/hide type scripts.
Charlie Button almost 2 years ago in SYNCHRO Control / Forms 1 Shipped

Implement customize columns in Add/delete Links window

It can be challenging for users to find the right task to add/delete links if they don’t have enough information. It would be nice to implement customize columns in the Add/ delete links window so user has such flexibility.
Dimitrios Mitritsios almost 4 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Shipped

Slow down 4D simulation speeds

Playing the simulation under the Schedule tab, even with Day and Slow Speed options selected, is too fast for projects that are being tracked on an hourly basis (eg emergency train outage, Shutdown / Turnaround) The same goes for reviewing simulat...
Arpit Prakash almost 4 years ago in SYNCHRO Control / Models 0 Shipped

Allow user to save appearance profile in the auto-matching rule

We should be able to select the “Appearance profile” at Rule level and store it with the Rule. You could keep the one on the window “Auto Matching (Resources to Tasks)” just in case someone needs to override, but this field should be governed by t...
Guest about 4 years ago in SYNCHRO 4D Pro / Auto-Match/Assignments/Resource Usage 0 Shipped

Progressing task by R units

DD is set to 12/7/2020 Create a task and assign a resource to the task. Resource is set to Driving. Duration will change if the planned units/ time is changed. Planned units will change if Duration is changed. Set DD to 12/8/2020. Set Progress to ...
Guest about 4 years ago in SYNCHRO 4D Pro 0 Shipped

Import from SP File is disable on iModel seeded project

Working with 4D Pro with 3D model come from imodel hub. The import from SP is disable. How we can apply the project template, import set of appearance profile, etc etc. Thank you, Indrawan
Indrawan Wijaya about 4 years ago in SYNCHRO 4D Pro 0 Shipped

Calendar and Resource Units

NTI reported the following issue - 1) Create a calendar with custom working hours - for example, 7.5 hours per day 2) Create a resource (optional to assign the resource calendar to this custom calendar) 3) Assign this resource to a task with durat...
Guest about 4 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Shipped