Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?

All ideas

Showing 1325

Message or a Tooltip on not being able to upload a file directly from zip

Add a message that files need to be unzipped before it can be uploaded. When selecting a PDF from zip, I am able to drag & drop. I get an error message that the PDF failed to upload. Maybe include a message at the top stating files that are in...
Derryl Acosta almost 2 years ago in SYNCHRO Control / Plan Sets 0 Likely to implement

Reassign Button in SYNCHRO Field

The possibility to reassign a form could be integrated into the SYNCHRO Field and not only limited to SYNCHRO Control.
Joana Isabel Neves Gomes about 1 year ago in Field / Forms | Forms 4 Future Consideration

Ability to export Binding list for all Forms/Inspections in the project

Currently, we have to go Form by Form to export a list of Bindings, which is required for Power BI integration. We can add an option to export for all projects here -
Arpit Prakash 12 months ago in SYNCHRO Control / Forms 0

Make Hierarchy tree and Inspection Group tabs accessible from a single page

The hierarchy tree config works with Inspection Groups and Attribute Forms but is in a separate admin module. They should all be on the same page for a unified workflow experience.
Arpit Prakash 9 months ago in SYNCHRO Control / Inspection 0

synchronise saved views between synchro imodel and connect design review / itwinhub

it would be great that the saved views created in synchro control imodel could be automatically synchronized over to the other platform / services such as design review and itwin hub
Guest almost 4 years ago in SYNCHRO Control / Models 1 Will not implement

Microsoft Teams Integration

We would like to see the ProjectWise Web + Microsoft Teams integration expanded to support Synchro Control projects. Currently, we can add Control projects as Web pages in Teams, but we would prefer if we could use the PW Teams integration that we...
Brian Glaser over 1 year ago in SYNCHRO Control / Admin 0

Default to Window Placement #4

As an enterprise, we need the ability to default a window placement for our users. Our teams are used to seeing a similar layout to Window Placement number 4 in other CPM Scheduling Tools. We would like to scale the use of Synchro Scheduler to rep...
Thomas Whiteley over 2 years ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 0

Ability to publish Form data with Location to ArcGIS

No description provided
Arpit Prakash 9 months ago in SYNCHRO Control / Admin 0

Actions for Inspections

Previously created Actions/Scripts should not be deleted if the inspection forms are updated via Excel upload. The desired behavior is error messages in Actions if bindings are not found.
Shaohua Guan over 1 year ago in SYNCHRO Control / Inspection 0 Planned

Show Legend based on Appearance Profiles in the 3D Window of Synchro Control \ Schedule

Currently no Legend is displayed in the 3D Window accessible from the Schedule functionality of Synchro Control. As a Synchro .sp file can be related to various subjects: Engineering Steps, Procurement Cycle, Construction Sequences,... As Legends ...
Thibault Dumas over 3 years ago in SYNCHRO Control 2 Future consideration