Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

SYNCHRO Control

Showing 249

Link the schedule to user-created issue forms.

Users want to know which Tasks the issues they need to work on are related to so they can track their progress.
HoSang Jeon over 1 year ago in SYNCHRO Control / Schedule 0

Include coordinates in export data to excel

Include marked location coordinates - longitude and latitude values when exporting forms data to excel.
Bhanu Chauhan 9 months ago in SYNCHRO Control / Forms 0

Option to Delete Multiple Attachments from a Form

It would be helpful to have the option of Deleting Multiple Attachments from a Form filled out rather than one at a time. There are times we have a lot of attachments on a form we escalated and need to delete all the attached documents from the form.
David Dudek Jr. almost 3 years ago in SYNCHRO Control 0 Planned

Ability to create Build iTwin project using API

Currently unavailable but desperately needed: Ability to create Build iTwin project using API where a project per subcontractor model is adopted to allow rapid deployment
Kiril Tasev 9 months ago in SYNCHRO Control / APIs 0

Import users: untick box for invitation email

In the "Manage your Team" area of Synchro Control, I usually use the "old layout" and click on Import users. This allows me to bulk import users by uploading a csv file. I can then untick a box which says "Send project invitation email to import p...
Ruth Fuller 9 months ago in SYNCHRO Control / Admin 0

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest over 4 years ago in SYNCHRO Control / Inspection 0 Planned

Custom icon or icon library to represent custom form types on the map and model.

Allows a user to differentiate between other items on the map. The user would have the option when creating the custom form in the UI forms designer to assign an icon to it.
Guest over 5 years ago in SYNCHRO Control / Maps / Models 1 Planned

Project creation through the API

When creating a project using the ITwin API that project is not visible in SYNCHRO Control. Project creation through the Projects API was a request they made when the Projects API was being migrated into the iTwin API and never responded too.
Russ Campton over 1 year ago in SYNCHRO Control / APIs 0

Shared With in PowerBI Connector

The Shared With does not come if The form is using the the Assigned to. It is prefer to have Shared With separately and able to pull all contains in Shared With. (currently only get the first person / role) regards, Indrawan
Indrawan Wijaya over 1 year ago in SYNCHRO Control / APIs 0

Label wrap text

Text area labels should behave like paragraphs (They should wrap text, similar to MS Excel).
Ashley Edmonds over 2 years ago in SYNCHRO Control / Forms 1 Planned