Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1342

Enable a project to be at draft status

When reprovisioning a project or setting a new project we need to create roles and invite users. ALso we need to set forms as Published and get the project ready for use. People will get notifications and will be able to access the project at that...
Kiril Tasev 3 months ago in SYNCHRO Control / Forms 0

Ability to set Today's Date as a Binding in Forms

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0

Costum Layout and Grid Control

I have a form with several grid controls, with several rows. I want to print it with Costum layout, with "flow" layout type. Those grid controls have several rows, which combined, surpass the size of one A4 sheet. When i try to print it, the table...
Miguel Meninas about 1 year ago in SYNCHRO Control / Forms 0

Ability to upload PDF from PWDI to Plan Set

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / PDF Markup 0 Already exists

Ability to disable Assign To dialog for specific workflow transitions

This is helpful in instances where the final approval will always be the one that's assigned a closed Form. A good place to disable it would be under Forms > Set workflow > Edit transition button > Advanced > Include comment on transit...
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0

Show Legend based on Appearance Profiles in the 3D Window of Synchro Control \ Schedule

Currently no Legend is displayed in the 3D Window accessible from the Schedule functionality of Synchro Control. As a Synchro .sp file can be related to various subjects: Engineering Steps, Procurement Cycle, Construction Sequences,... As Legends ...
Thibault Dumas over 3 years ago in SYNCHRO Control 2 Future consideration

Ability to map a Survey control to Radio group in a fillable PDF

No description provided
Arpit Prakash about 1 year ago in SYNCHRO Control / Forms 0

Ability to save and share dimensions/information from Measurement Tools

This would be extremely helpful when trying to convey information between stakeholders and allow for consistent information sharing as it is not always easy to target and select the exact point you are measuring in the model. Having the ability to...
Guest over 2 years ago in SYNCHRO Control / Models 2 Future consideration

Integration of PDF document links with 3D model elements

Have PDF documents from the SYNCHRO Documents folder, such as "shop drawings or detail sheets" that can be accessed by clicking in the properties section of a 3D model that links directly to the PDF sheet it's referencing.
Tony Bonacorsi almost 2 years ago in Field / Documents | Connections 1 Planned

Maintain PDF mapping after re-uploading similar pdf with updates

We should be able to maintain the mapping if the fillable fields are the same. This will save much time remapping when small updates (additions/formatting) to the PDF have to be reimported.
Arpit Prakash over 1 year ago in SYNCHRO Control / Forms 0