Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1310

Integration of PDF document links with 3D model elements

Have PDF documents from the SYNCHRO Documents folder, such as "shop drawings or detail sheets" that can be accessed by clicking in the properties section of a 3D model that links directly to the PDF sheet it's referencing.
Tony Bonacorsi over 1 year ago in Field / Documents | Connections 1 Planned

Synchro 4D Pro and Primavera Open Cloud (OPC) integration

We would like to see an integration with Synchro 4D Pro and Primavera Open Cloud (OPC). The P6 integration API that is already available is only compatible with P6 and EPS, not with OPC. Instead of manually importing and synchronizing .XML files w...
Caitlin Zeuli over 3 years ago in SYNCHRO 4D Pro 0 Future consideration

Ability to set Cascading list within a Grid control

Also, if there's only one option in a cascaded list, it should automatically get populated.
Arpit Prakash 7 months ago in SYNCHRO Control / Forms 0

Sorting in Time and Usage Matrix for People and Equipment, company, resource role etc

Currently the Matrix is set up to include People and Equipment in 1 table with sorting by Company, Role and Name. It is quite time consuming to have people and equipment mixed together. It would be good to be able to keep them separated and sortin...
Nageshwar Sesetti over 2 years ago in Perform / Timesheets 2 Future Consideration

Reassign Button in SYNCHRO Field

The possibility to reassign a form could be integrated into the SYNCHRO Field and not only limited to SYNCHRO Control.
Joana Isabel Neves Gomes about 1 year ago in Field / Forms | Forms 4 Future Consideration

Ability to disable Assign To dialog for specific workflow transitions

This is helpful in instances where the final approval will always be the one that's assigned a closed Form. A good place to disable it would be under Forms > Set workflow > Edit transition button > Advanced > Include comment on transit...
Arpit Test 10 months ago in SYNCHRO Control / Forms 1

Critical Path in Visual Reports/Animations

Any chance or option to view critical path elements in the model while running the animation?
Ameya Talekar 3 months ago in SYNCHRO 4D Pro / SYNCHRO Scheduler 0

KPI Pie charts, Progress figures in animation

Considering the synced schedule to be cost and resourse loaded, is there a R&D in progress or any option already available to view KPI's in the animation video without needing to buy additional package from the third party?
Ameya Talekar 3 months ago in SYNCHRO 4D Pro / Animations 0

Visualize non 3D resources in Control

Hi, Currently we can only graphically visualize the 3D resources assigned to tasks when the task is selected. Our users would like to see also the traditional resources that are assigned to tasks, i.e. human resources. This can be added in Task Pr...
Alexandru Buzan over 1 year ago in SYNCHRO Control / Schedule 0

Ability to save and share dimensions/information from Measurement Tools

This would be extremely helpful when trying to convey information between stakeholders and allow for consistent information sharing as it is not always easy to target and select the exact point you are measuring in the model. Having the ability to...
Guest almost 2 years ago in SYNCHRO Control / Models 2 Future consideration