Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

SYNCHRO Control

Showing 165

Need a scroll bar for Initialization Settings

I cannot see the Transitions or Save option without zooming out the browser -
Arpit Prakash about 2 years ago in SYNCHRO Control 0 Shipped

Scripts - Equation Builder

More functions within the equation builder (similar to MS Excel) that allow more processing of whole and decimal numbers (e.g. splitting a decimal from the whole number)
Ashley Edmonds about 2 years ago in SYNCHRO Control / Forms 1 Shipped

Ability to search for Bindings for a Grid


Arpit Prakash about 2 years ago in SYNCHRO Control 0 Shipped

Provide a way to add a different sized QR Code

Sometimes depending on the sheet size and graphical content, I want to place a slightly smaller QR Code so it does not interfere with the page content
Paul Johnson over 2 years ago in SYNCHRO Control / Plan Sets 0 Shipped

Slow down 4D simulation speeds

Playing the simulation under the Schedule tab, even with Day and Slow Speed options selected, is too fast for projects that are being tracked on an hourly basis (eg emergency train outage, Shutdown / Turnaround) The same goes for reviewing simulat...
Arpit Prakash over 4 years ago in SYNCHRO Control / Models 0 Shipped

On/Off switch for scripts

Hi, whilst testing forms with multiple scripts it is necessary to isolate some scripts to find the culprit. Ability to switch scripts on/off would is much needed.
Kiril Tasev over 2 years ago in SYNCHRO Control / Forms 0 Shipped

Use original sheet QR code placement when revisioning a sheet

When placing a QR code on a revisioned sheet - the starting placement location for that QR Code should be the QR Code location set in the original sheet.
Paul Johnson over 2 years ago in SYNCHRO Control / Plan Sets 0 Shipped

Place QR Code on selection set of sheets at one time

We need to have the ability to place a QR code on multiple sheets in a single action as moving it from the current default location on hundreds of individual sheets takes hours to perform and is not efficient.
Paul Johnson over 2 years ago in SYNCHRO Control / Plan Sets 0 Shipped

Have a way to quickly view which published PDFs do not have a QR code.

It would be useful to implement some way to identify which published sheets need to have a QR Code placed. Possibly implement a red flag tag action of sheets that have no QR code. Essentially we need a quick and easy way to identify which publishe...
Paul Johnson over 2 years ago in SYNCHRO Control 1 Shipped

Support dates as required for transition

For certain workflows there is a need to have dates required as a part of a transition as opposed to in a status. As an example, there Desired workflow for an Inspection Request: Planning User fills inspection details All mandatory fields can be s...
Arnar Agustsson over 2 years ago in SYNCHRO Control / Forms 2 Shipped