Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1309 of 1309

Include Critical Path Test in the Schedule Health Check

The Schedule Heath Check report mentions the Critical Path Test as item 12. However the report does not perform the check automatically, instead the user should perform the test manually. With this addition the full DCMA-14 test can be performed w...
Michiel Janssens almost 3 years ago in SYNCHRO 4D Pro / Printing/Reports 0 Will not implement

Add a tooltip to the disabled "Revise" button in the meatball menus in the Cost grids.

When user doesn't have the "XXX: Create" permission on the associated contract, the "Revise" button will be hidden for Rejected (not already revised) PCOs/COs/PayApps. If a user has the "XXX: Create" permission, but associated contract is unpublis...
Guest almost 3 years ago in Contracts 0 Future Consideration

Import Non labor data from Primavera P6 to Synchro

Currently I am not able to import non labor data to synchro. If we could import non labor data and apply global changes in the synchro itself it would be beneficial.
Ameya Talekar about 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Make Field working with Oil & Gas models

Users: Tony Beamish <tony@mitosisdigitech.com>; Dave Milne <dave@mitosisdigitech.com> Users report that Synchro Field cannot handle their models - we tried set it up for statusing (6.3 and 6.4) without success - see screenshots. We cou...
Daria Kosmala about 3 years ago in Field / Status update | Resources 0 Already exists

Add Diameter Inch as New Unit in Synchro Rules

It's useful for user especially in O&G field which normally deal with pipe or gas line installation. With that Diameter Inch Unit will help a lot to measure the work rate within Synchro.
Owais Qarni about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0 Future consideration

To enable budgeted direct cost to be rolled up based on the task filter applied

The budgeted cost from filtered activities (based on task filters) in Synchro currently only rolls up to the overall total budgeted cost (meaning for all activities) instead of showing the cost of the filtered tasks itself. It would be helpful if ...
Nabila Shahilla about 3 years ago in SYNCHRO 4D Pro / Tasks/Scheduling/Gantt Chart 0

Click and Preview Document - using Photo Drop

Try to utilize the Photo Drop. But found the below limitation in Control, cannot click the thumbnail to see the document. It is possible to make it possible? I check in FIELD app, it works. And for the document, now the thumbnail is empty, also if...
Indrawan Wijaya about 3 years ago in SYNCHRO Control / Forms 0 Planned

Assign Parent level of resources without children (P6 allows this)

No description provided
alex van belleghem about 3 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Will not implement

Duplicate form templates

Sometimes we need to create similar types/layouts of forms in a single project and rather than starting from scratch each time, it would be great to be able to copy an existing form (in the Manage Forms section of Admin) to save time.
Guest about 3 years ago in SYNCHRO Control / Forms 0 Already exists

Display attached documents in form review

User has requested that they be able to view uploaded files from a plan set on Form Definitions such as RFIs/FCRs. Attached is an image to show where they would like those files to be displayed.
Guest about 3 years ago in SYNCHRO Control / Forms 0 Already exists