Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1298

Multi 2D views to support Planning

At the moment only having a 2D Plot Plan does not lend itself to working on any vertical construction. If we look at the BGR example we will have areas on the plot plan that will have numerous work packs stacked on top of each other and the user w...
Guest over 5 years ago in SYNCHRO Control 0

Show disabled "Create contract" button and tooltip for users without "Setup Cost contracts" permission.

At the current moment, if a user has the Cost role in the project, but the “Setup Cost contracts” permission is not set for him/her in the Administration/Manage your team section, the “Create contract” button will be hidden on the “Contracts” page...
Guest over 2 years ago in Contracts 0 Will not implement

Ability to Zip Files In Control and Email User(s)

The ability to zip files and send directly in a Control Project to Outside Organizations
Derryl Acosta over 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Ability to see the Workflow Status under 'Work'

We want to be able to see the workflow Status under the 'Work' tab in the overview of all the created issues, RFI's and so on. This will benefit all, as the status shows who needs to take action
Morten Sørensen over 2 years ago in SYNCHRO Control / Forms 0 Already exists

Reality Data/Visibility Tree cut off on Control

No description provided
Shaohua Guan over 2 years ago in SYNCHRO Control / Models 1 Future consideration

daily reports/logs voice transcription

Interesting idea on facilitating voice transcription of daily reports. I can see several use cases of this being beneficial especially around safety incidents needing realtime records, issue capturing, or inclement weather. Allowing the inclusion ...
Jonathan Cunningham over 5 years ago in Field / Forms | Media 1 Planned

iModel connection status in Home view

Display the status of connection in 'Manage iModel' view so that it is not required to go to each iModel connection to see it.
Manoj Jamma over 2 years ago in SYNCHRO Control / Models 1 Future consideration

Display resource mapping in 3d view

Would it be possible to see the human resources allocation by color in the 3d view and be able to see where the human resource overallocation by area and also be able to use this to heat map red orange or green status for high levels of resources
Gerard Doheny over 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Already exists

Include Critical Path Test in the Schedule Health Check

The Schedule Heath Check report mentions the Critical Path Test as item 12. However the report does not perform the check automatically, instead the user should perform the test manually. With this addition the full DCMA-14 test can be performed w...
Michiel Janssens over 2 years ago in SYNCHRO 4D Pro / Printing/Reports 0 Will not implement

Update Resources based on updated 3D model

If new elements are added in 3D model for which resources have been created in Synchro 4D pro. There must be option to recreate the existing resources without breaking the links and maintaining the hierarchy as per the 3D model.
Jerry David Jaypaul over 2 years ago in SYNCHRO 4D Pro / Resources/Resource Groups/Resource Status 0 Planned