We like the use of forms to manage temporary construction assets such as Traffic Control Devices and Stormwater Management. These items require daily to weekly maintenance. In order to show inspection happened on a project wide basis, bulk editing...
All sliced geometry that is linked in 4D pro still has parent objects shown in Control Viewer. The ability to hide them all with one click would be very useful
Integration of PDF document links with 3D model elements
Have PDF documents from the SYNCHRO Documents folder, such as "shop drawings or detail sheets" that can be accessed by clicking in the properties section of a 3D model that links directly to the PDF sheet it's referencing.
Synchro 4D Pro and Primavera Open Cloud (OPC) integration
We would like to see an integration with Synchro 4D Pro and Primavera Open Cloud (OPC). The P6 integration API that is already available is only compatible with P6 and EPS, not with OPC. Instead of manually importing and synchronizing .XML files w...
Caitlin Zeuli
over 3 years ago
in SYNCHRO 4D Pro
1
Future consideration
We need a project-wide binding that can be assigned values at a project level, and be used across multiple Forms definition/Inspections. This will enable users to re-use repetitive information like Project Details.
Ability to export Binding list for all Forms/Inspections in the project
Currently, we have to go Form by Form to export a list of Bindings, which is required for Power BI integration. We can add an option to export for all projects here -
Sorting in Time and Usage Matrix for People and Equipment, company, resource role etc
Currently the Matrix is set up to include People and Equipment in 1 table with sorting by Company, Role and Name. It is quite time consuming to have people and equipment mixed together. It would be good to be able to keep them separated and sortin...
Nageshwar Sesetti
over 2 years ago
in Perform / Timesheets
2
Future Consideration