Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1325

Sorting in Time and Usage Matrix for People and Equipment, company, resource role etc

Currently the Matrix is set up to include People and Equipment in 1 table with sorting by Company, Role and Name. It is quite time consuming to have people and equipment mixed together. It would be good to be able to keep them separated and sortin...
Nageshwar Sesetti over 2 years ago in Perform / Timesheets 2 Future Consideration

Media Indexing - Filters on photo folders

I would like to be able to filter my photos by folder in my documents section once we are able to dump photos into folder for indexing
Beth Buerger 3 months ago in SYNCHRO Control / Media Indexing 0 Future consideration

Dissociate Plan Set admin setting from Edit project detail setting

Currently, if a Role only has Plan Set admin checked but not Edit Project Detail, they will not see Plan Set options under Admin. Project settings and Plan Set settings are relevant to different personas, so need not be connected.
Arpit Prakash 11 months ago in SYNCHRO Control / Admin 0

To export worksheets to Excel with breakdown structure

It would be very useful when worksheets are exported to Excel to export its breakdown structure this names of summaries and indentions. Please, add this function.
Дмитрий Павлович Сергеев over 3 years ago in SYNCHRO 4D Pro / Import/Export 0 Planned

Include 3D Filters in Excel Export/Import

Please consider adding the 3D Filters as objects that can be exported to Excel file. This improvement will allow the users to configure the 3D filters within the excel spreadsheet, and then to import them in SYNCHRO 4D Pro, reducing the time spent...
Alexandru Buzan 3 months ago in SYNCHRO 4D Pro / Import/Export 0

Integration of PDF document links with 3D model elements

Have PDF documents from the SYNCHRO Documents folder, such as "shop drawings or detail sheets" that can be accessed by clicking in the properties section of a 3D model that links directly to the PDF sheet it's referencing.
Tony Bonacorsi over 1 year ago in Field / Documents | Connections 1 Planned

Related forms to be bound to a specific location or control in a form.

When we relate forms we usually do that for a specific reason or as a workaround to raise a form from within a form. When related currently the forms are showing bunched up together with no sensible order or context. As a user I want to see the es...
Kiril Tasev 11 months ago in SYNCHRO Control / Forms 0

Allow for deleting multiple Work Areas at once

Manual deletion of 50+ Work Areas is such a pain.
Patryk Makowski about 1 year ago in SYNCHRO Modeler 0 Needs review

Automate the process of creating a SYNCHRO/BIC project

No description provided
Arpit Prakash 11 months ago in SYNCHRO Control 0

Allow SYNCHRO Control forms to attach documents from Sharepoint repository

Many SP users do not like to maintain 2 data repositories, meaning they do not want to copy documents from SP into SYNCHRO document. They want to be able to attach documents residing in SP
Iwan Pribadi about 4 years ago in SYNCHRO Control / Forms 0 Future consideration