PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1211

Options to customize the table part of the Gantt window accessible from Synchro Control \ Schedule

Necessary to have the possibility to view in 4D Review the same layouts as those which have been defined in Synchro Pro. These layouts must include : - Schedule Tasks Group and Sort, - Schedules tasks filters, - Relevant Schedule Tasks Attrib...
Thibault Dumas over 2 years ago in SYNCHRO Control / Models 1 Planned

"Move Forward/Back one step" feature request.

It would be nice to have the ability to view the animation while skipping forward by a unit of speed each time the user clicks, depending on the selected 4D speed (e.g. 1 week, 1 month, etc.) (this already exists in 4D Pro).
HoSang Jeon about 2 months ago in SYNCHRO Control / Model Viewer 0

Have the ability to move widgets and tables to a second monitor

Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?
Dan Sheldon about 1 year ago in SYNCHRO Control / Models 0 Future consideration

Link existing Issues/Forms to Documents

It would be very useful to be able to link forms (RFI's, for instance) that are already created to a plan sheet or PDF document. Right now, the only way to connect PDFs with forms is by creating the form from the document, but you cannot link it o...
Rafael Ramirez Vizuete 12 months ago in SYNCHRO Control / PDF Markup 1 Future consideration

I want to update inspection form status for multiple forms at a time

As a user, when I select more than one inspection form in Admin/Manage Forms/Inspections, the Change Status and Delete buttons grey out. I'd like to be able to change the status of multiple forms at the same time.
Mariano Colicchio 3 months ago in SYNCHRO Control / Inspection 0 Future consideration

Allow for deleting multiple Work Areas at once

Manual deletion of 50+ Work Areas is such a pain.
Patryk Makowski 5 months ago in SYNCHRO Modeler 0 Needs review

Microsoft Teams Integration

We would like to see the ProjectWise Web + Microsoft Teams integration expanded to support Synchro Control projects. Currently, we can add Control projects as Web pages in Teams, but we would prefer if we could use the PW Teams integration that we...
Brian Glaser 9 months ago in SYNCHRO Control / Admin 0

Private and Public markups

As a Construction Documentation management software, there should be a differentiation between public and private markups. As of now, any project member can markup any document, including plan sets, and those markups would be seen by everybody els...
Rafael Ramirez Vizuete 12 months ago in SYNCHRO Control / PDF Markup 0 Future consideration

smoother and faster navigation in iModel

users and project team have feedback that SYNCHRO Control iModel navigation is laggy and slow. please look into the matter so that the model can orbit and rotate smoother and faster.
Guest about 3 years ago in SYNCHRO Control / Models 2 Already exists

Provide option for linked questions in Survey control

Provide option for linked questions in survey control, where more of the same type of questions can be chosen. see image for use case. It should act as a multiselect checkboxes but with questions. This also allows the user to attach the supporting...
Kiril Tasev about 2 months ago in SYNCHRO Control / Forms 1