PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Have the ability to move widgets and tables to a second monitor
Screen real estate to see the model is getting smaller with more widgets and tools can we move widgets to a second monitor?

All ideas

Showing 1323

Integration of PDF document links with 3D model elements

Have PDF documents from the SYNCHRO Documents folder, such as "shop drawings or detail sheets" that can be accessed by clicking in the properties section of a 3D model that links directly to the PDF sheet it's referencing.
Tony Bonacorsi over 1 year ago in Field / Documents | Connections 1 Planned

Dissociate Plan Set admin setting from Edit project detail setting

Currently, if a Role only has Plan Set admin checked but not Edit Project Detail, they will not see Plan Set options under Admin. Project settings and Plan Set settings are relevant to different personas, so need not be connected.
Arpit Prakash 11 months ago in SYNCHRO Control / Admin 0

QR and other codes scanning

Please, provide option to scan QR, data matrix and other codes in Field and Control. Allow the result as a decoded text to be populated and used in a control i.e. to read bu user, compare to another value in a different field or as a link to follo...
Kiril Tasev 3 months ago in Field / Forms | Forms 0

Trailing zeros not showing up on the "Decimal" Numberbox Field

Currently, trailing zeros (trailing zeros are a sequence of 0 in the decimal representation of a number, after which no other digits follow ) do not show up, when using a "decimal " numberbox field . There should be a button (per example) allowing...
Miguel Meninas 9 months ago in SYNCHRO Control / Forms 0

Allow for deleting multiple Work Areas at once

Manual deletion of 50+ Work Areas is such a pain.
Patryk Makowski about 1 year ago in SYNCHRO Modeler 0 Needs review

Related forms to be bound to a specific location or control in a form.

When we relate forms we usually do that for a specific reason or as a workaround to raise a form from within a form. When related currently the forms are showing bunched up together with no sensible order or context. As a user I want to see the es...
Kiril Tasev 12 months ago in SYNCHRO Control / Forms 0

Ability to download a previously uploaded cost code excel sheet.

if you have a user who originally created a cost code excel spreadsheet upload, and they leave the company, we have no way to download and/or update the cost code structure without a version of the file. Currently you need the original spreadsheet...
Corey Johnson 6 months ago in SYNCHRO Modeler 0 Needs review

Automate the process of creating a SYNCHRO/BIC project

No description provided
Arpit Prakash 12 months ago in SYNCHRO Control 0

Ability to save and share dimensions/information from Measurement Tools

This would be extremely helpful when trying to convey information between stakeholders and allow for consistent information sharing as it is not always easy to target and select the exact point you are measuring in the model. Having the ability to...
Guest about 2 years ago in SYNCHRO Control / Models 2 Future consideration

Visualize non 3D resources in Control

Hi, Currently we can only graphically visualize the 3D resources assigned to tasks when the task is selected. Our users would like to see also the traditional resources that are assigned to tasks, i.e. human resources. This can be added in Task Pr...
Alexandru Buzan almost 2 years ago in SYNCHRO Control / Schedule 0