Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1298

take measurements and calculate areas while performing an inspecting

as an inspector I use a Wheel measurement device to measure distances and calculate area. I want to be able to use an enhanced GPS device to record these points and display on a map. I should be able to measure along a line (2Pts) measure multiple...
Bill McNamara about 5 years ago in SYNCHRO Control / Maps 0 Future consideration

Enable deleting Work packages created on Control

Please enable deleting Work Packages created on Control. Our user needs to delete packages she created on her Control project. This funtion does not exist, as we were informed by Synchro tech support.
Daria Kosmala over 2 years ago in SYNCHRO Control / Forms 0 Will not implement

Add deselect option in resource assignment dialog when objects are already assigned to another resource

Often, you will forget to deselect a 3D object before selecting other objects to assign to a resource. In this case, at the end of the resource assignment wizard there is an option to either unassign the objects already in a resource, or cancel. I...
about 5 years ago in SYNCHRO 4D Pro 0 Future consideration

Ability to schedule export data to excel

No description provided
Balvit Singh over 2 years ago in SYNCHRO Control 0

Dropdown menu with suggestions when scripting

When writing/typing a script, there is only one suggestion displayed when entering the first letter(s). When entering the first letter(s), there should be a dropdown menu with multiple/all suggestions. This way scripting will be a lot easier.
over 5 years ago in SYNCHRO 4D Pro 2 Future consideration

Project Risk Management could be part of the Issues module by adding a Risk entry to the Form.

Project Risk manages 'Risk' to the Project (Schedule), not Safety. Risks found and registered with possible impact to the project schedule is used to plan and mitigate the issue. Data can then be further used to raise ongoing lessons learned . Hap...
Guest over 5 years ago in SYNCHRO Control 0

Map based RFI and progress update

There shall be functionality for update of progress using map location along with 3D object
Ketan Gupta over 2 years ago in Field / Status update | Resources 2 Will not implement

There shall be two way mapping between 3D models and schedules. If we select any activity, the respective 3D model should be highlighted rest of the 3D objects shall be visible with least transparency.

It will be useful to analyse the intrfaces between two different disciplines
Ketan Gupta over 2 years ago in SYNCHRO 4D Pro / 3D View/View Properties/Viewpoints/Layouts 0 Already exists

Summary Grid View - Sort by Attachment or Link

Would like the ability to Sort or even Filter in the Summary Grid View of a particular Form Definition if a Form Definition contains a link or an attachment
Dee User List Acosta over 2 years ago in SYNCHRO Control / Forms 0 Future consideration

Show documents and forms on maps

It would be useful to be able to use the map to determine where documents and forms such as issues are located. There should be a toggle to show/hide based on categories.
Arnar Agustsson over 5 years ago in Field / Forms | Maps 1 Planned