Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Publish from PW Create Rendition to SYNCHRO Control PDF
Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.

All ideas

Showing 1330 of 1330

Hidden label

In some cases where design and as built values are living next to each other, the controls may not have labels to provide eye pleasant layout. See attached form design. Unfortunately, when we display the form in the instances register, the column ...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Develop modular workflows

With many repetitive forms there is a need for modular workflows that can be repeated reused or chosen to run for a particular state. Our current need is that as a user I want to be able to have a number of line items, produce two or three simple ...
Kiril Tasev over 1 year ago in SYNCHRO Control / Forms 0 Future consideration

Provide static table control

Further to CSPM-I-631: Provide static table control. To show a user defined table. User defined matrix e.g. 4 columns by 8 rows. First row set as table headings. Availability to populate cell data in the Form manager and/or through csv upload. Abi...
Kiril Tasev over 1 year ago in SYNCHRO Control 0 Future consideration

Track time/duration used for payment application

currently only dollar amount is tracked when issuing payment application. User needs to track time/duration used for each payment application and calculate remaining duration for the contract.
Shaohua Guan over 1 year ago in Contracts 0

Auto populate fields when publish plan set for bulk upload

Right now, users need to manually type in Sheet #, Discipline, Revision, and Revision date when the publishing plan set. These fields along with Type and Sheet name being auto-populated according to the content of the uploaded PDFs when bulk uploa...
Shaohua Guan over 1 year ago in SYNCHRO Control / Plan Sets 0

Allow user to specify key used for mapping

When we import Excel File to SYNCHRO, It is good it can accept other data as the Mapping Key, not only the SYNCHRO Standard ID. Please check the PDF file attached in more details.
Indrawan Gmail over 2 years ago in SYNCHRO 4D Pro / Import/Export 4 Planned

Create extrusions from 2D drawing to animate construction sequence without 3D model

At an early planning stage or if the project does not have 3D models, construction sequence can be created from 2D shapes. A valuable improvement would be a way to quickly create extrusions from 2D drawings (e.g. DWG or PDF) to quickly create a "m...
Kate Hester about 4 years ago in SYNCHRO 4D Pro / Import/Export 0 Future consideration

Option to Link Tagged Items to Revised/Current Qty/Hrs

Hi, would be great to have a tick box where I can select to make the activity's revised/current qty/hours, align automatically to whatever the tagged item list contains. When I import, it assigns to the Tagged item register and items values automa...
David Viola over 2 years ago in Perform / Progress Measurement 0 Future Consideration

Publish from PW Create Rendition to SYNCHRO Control PDF

Can ProjectWise ICS printing of PDF publish directly to a SYNCHRO Control Project?
Dan Sheldon about 4 years ago in SYNCHRO Control / Plan Sets 1 Future consideration

Project Location - Import project boundary from CAD file

User asked if a function to import the project location from a CAD drawing can be added to Project Location setup page. Basically import the boundary rather than drawing it on the map. It would be helpful for very long linear projects.
Alexandru Buzan about 4 years ago in SYNCHRO Control / Admin 0 Future consideration