When Adding a new User to SYNCHRO and I put their Full Name in the Name field their Name should actually show up rather than as FirstName LastName.
When Adding a new User to SYNCHRO and I put their Full Name in the Name field their Name should actually show up rather than as FirstName and LastName. If the User want to update their name at a later date this should be an option in their profile...
Once Received RFQ response from Suppliers, the Cost Variant data should compare and generate the Cost Comparision Report. This report is useful to conform the correct suppliers and also selected suppliers profiles for QTY, Cost, all etc.
To be able to display annotations in the 3D window accessible from Synchro Control \ Schedule.
For some Use-Cases, it can be necessary to add information to the 4D Model under the form of annotation to highlight specific items (schedule items or Material Resources). It is therefore required to have the possibility to import into Synchro Con...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control
1
Future consideration
To be able to visualize in Synchro Control \ Schedule the Predecessors and Successors of a Task and to navigate between them.
As in Synchro 4D Pro to have the possibility when selecting a Task to view in Synchro Control \ Schedule the Predecessor(s) and the Successor(s) of the selected Task. When a task has been selected and its Predecessor(s) & Successor(s) displaye...
Thibault Dumas
almost 3 years ago
in SYNCHRO Control / Models
1
Future consideration
the goal is to filter the 4D view to today's or next week's work for the specific role based user viewing the 4D model, pref. based on activity codes, 3D or tasks filters (like SITE used to have!)
Currently QR Codes have a 255 char limitation. Alstom have requested/highlighted the need to have an increase in data stored within - Upto 16 columns within the QR Code.
Many times, we want to clear the Modeler Local Cache. And I think it is better to have the button to click, rather than need to go a folder location and delete it manually. This Clear Cache button should able to clear only selected iModel (not alw...
Indrawan Wijaya
about 1 year ago
in SYNCHRO Modeler
0
Needs review
Reflect simultaneous activities with different locations in a 4D animation
In road projects where there are different sections and different construction elements in which there are several tasks occurring at the same time in different locations, I would like to reflect simultaneous tasks with different locations in a 4D...