Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED Integration with the Headlight app to transfer data captured in Headlight to SYNCHRO Control
No description provided

All ideas

Showing 1345

call script from button on Ribbon

suggest calling any Script with a button on the ribbon bar. Similar to Microsoft Macros.
almost 6 years ago in SYNCHRO 4D Pro 2 Future consideration

Support Signatures in Forms

Able to sign a blank box on a form like those used for delivery so that the wet signature is captured. This also needs to be able to transfer onto a PDF rendition of the document.
Alastair Barbrook almost 2 years ago in SYNCHRO Control / Forms 0 Planned

Delete Completed forms

The Ability to delete a created form(s) (Either filled out on inactive/Draft forms). Can we have an option to have inactive/draft forms appear in a Recover Deleted Items section?
Derryl Acosta almost 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Traceability of changes on usage page

The engineers and finance teams wants to know who made any changes to Cost code through usage page after the docket have been received. Currently Synchro tracks any changes done on docket but doesn't have any functionality to check if any changes ...
Siddharth Sahare almost 3 years ago in EVM (Perform) / Resource Management 1 Future Consideration

enable transitions in offline mode

Some activities like inspections or witness poitns rely on multiple users beign on site and carrying an inspection. If satisfactory they will sign/certify the fact and can transition the flow between each other to do that. In offline mode this is ...
Kiril Tasev almost 3 years ago in Field / Forms | Inspections 0 Future Consideration

Export to Synchro 4D plugin for Autodesk Civil 3D

Looking for Direct Synchro 4D plugin for Civil3D.
ASHWIN RAJESH K about 2 years ago in SYNCHRO 4D Pro / Import/Export 0 Will not implement

Assign Resource Group to Task - New button

It is nive to have this new button. Assign Resource Group to Task. Please see image on the attachment.
Indrawan Gmail about 3 years ago in SYNCHRO 4D Pro 0 Planned

Filter columns in Control by multiple values

An example would be selecting multiple options under Status (Inreview & Approved) to exclude the ones we don’t want to see
Thomas Schimpf about 3 years ago in SYNCHRO Control / Reports 0 Future consideration

Form Definitions [Groupable & Collapsible]

Preconstruction Forms should be in the list of Forms, but under a group/heading called Preconstruction that can be minimized. This will prevent having a long list of Forms to look through.
Derryl Acosta about 4 years ago in SYNCHRO Control / Forms 0 Future consideration

Ability to Define Condition on Property Assignments during Transitions

I want to be able to define a condition for property assignments - One use case scenario is to automatically assign the Form to a User, based on a Project that was selected in the previous status.
Arpit Prakash about 2 years ago in SYNCHRO Control 0 Planned