Need to able to save the Date Filter in Schedule View. The Date Filter is always set to empty (play all project duration) when user open the Schedule tab. It is better is the date filter can be saved, one option may be save in Saved View.
When uploading an .sp file to Control, I sometimes get an error. It would be nice to receive a detailed error log that can point out exactly what needs to be fixed in order to view my iModel
3d iModel window should have a button to pop that window out to place on a second monitor. Similarly for Schedule window, and any other windows that take up a lot of screen space.
The month filter should open to the current month rather than the beginning or end of the project. This would allow for easier navigation for quick look a heads.
Working with different types of work packages in same work package area
How should we work in synchro with different type of work packages like Construction work packages, engineering work packages, procurement work packages and field installation work package which are usually in same work package area?
Utah DOT - User wants to get the Z difference or vertical clearance from any point or lines to a surface. This will be very useful for users to understand the space/ clearance they need for equipment operation, installation vertical constraint, etc.