Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED Add enable button to media indexing page to enable service if they have the RBAC role
If I don't have media indexing enabled on my project AND I'm an admin, we need to add a button her to enable it?

All ideas

Showing 1302

PDF geolocation by level for building

When using Synchro for a large building construction, we would like to have the possibility to along with the geolocation (X,Y) add the height to represent the different floor of the building. This will be important as some PDF will share the same...
Luc Poulin 8 months ago in SYNCHRO Control / Plan Sets 0

SMU in Matrix

We have start and finish time in Matrix. For plant, could we have start and finish SMU in Matrix
Nageshwar Sesetti about 2 years ago in Perform / Timesheets 1 Future Consideration

Change Assigned to font

Can the color scheme, background or font be changed in the synchro field app when users try to submit a form for review. When they submit a form for review it prompts them to assign a recipient for review, but the default image appears to be greye...
Arpit Prakash 8 months ago in Field / Forms | Forms 0 Planned

PDF, Excel, and Document Connections to Work Package in Work Package Export

Currently, it looks like you can only see .jpg and .png attachments when you export a work package from Control. AWP principles will have users constantly linking PDFs, excel documents, and other various documents to the work package. We really ne...
Doug Theret almost 4 years ago in SYNCHRO Control 1 Planned

Ability to automatically create a Form by uploading an existing fillable pdf

No description provided
Arpit Prakash over 1 year ago in SYNCHRO Control 0 Planned

To have the possibility in Synchro Control \ Schedule to display several 3D Windows based on different dates: current / baseline(s).

To be able to import in Synchro Control a Synchro 4D Pro .sp file which contains two or more 3D Windows. Different dates (i.e. current, baseline(s)) being used per 3D Window. To have all 3D Windows created in Synchro 4D Pro displayed in Synchro Co...
Thibault Dumas almost 3 years ago in SYNCHRO Control / Models 0 Future consideration

Model view - Don't show Work Assigned panel in Model View for Guest Users

When a Guest User logs into construction.bentley.com to view the 4D model they have to click on the Model icon in the top right corner to load up the 4D model. When the model loads up, the bottom half of their screen shows a panel that lists out w...
Ruth Fuller 12 months ago in SYNCHRO Control 0

Create a rule for printing when the fields are empty

For example: Create general rules so that if fields are empty, they print with “—".
Yessica Andrade Barbosa 4 months ago in SYNCHRO Control / Forms 0

Possibility to add more columns in "My Work"

No description provided
Yessica Andrade Barbosa 4 months ago in SYNCHRO Control / Forms 0

Enable Direct Assignment When Reopening Forms

When reopening the form could be possible to assign that reopening directly. 
Yessica Andrade Barbosa 4 months ago in SYNCHRO Control / Forms 0