Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Pinned ideas

View all
PINNED Display Photo Count within Media Indexing
Add a display indicating “Photos 1 – 30 of 3,000 displayed” so users can see how many photos are logged.
PINNED SYNCHRO Field - Update Task Start date based off Earliest Resource Status
I am not sure if this is planned or not, but when we have the ability to update Resource Status through SYNCHRO Field, there should be an option (or Automatic) to change the status of the Task from Planned to Started, and also update the date to r...

All ideas

Showing 1345

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy

Improving bulk imported 'inspections work scope' transparency within the inspection WBS / Hierarchy - by adding the required inspections to the items / tags. Currently the WBS shows the parent / child / items so work scope; post import is not visi...
Guest about 4 years ago in SYNCHRO Control / Inspection 0 Planned

PDF Plan set setting Bulk Edit

When editing the the PDF plan set it would be beneficial to bulk edit items such as Discipline Dates, Type to make initial publishing and QC corrections more efficient
Bill McNamara almost 5 years ago in SYNCHRO Control / Plan Sets 0 Planned

Ability to re-assign/copy forms

This is possible in Control, but not in Field.
Arpit Prakash over 1 year ago in Field / Forms | Forms / Forms | Inspections 0 Future Consideration

Ability to move files seamlessly between PW and Control > Documents

No description provided
Arpit Prakash about 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Ability to bulk update Document Folder Access

Currently, the way this is set up is to remove access for one Role, all other Roles need to be given access, by manually checking on each. If we had a bulk update option, it will be easier to simply remove the restricted users.
Arpit Prakash about 2 years ago in SYNCHRO Control / Documents 0 Future consideration

Ability to receive periodic reports of Forms assigned to a user

Admin should be able to specify which Form types should be part of a daily report, that gets sent out periodically to the assigned users.
Arpit Prakash about 2 years ago in SYNCHRO Control / Reports 0 Future consideration

Site Diaries

A key part of construction is the maintenance of a site diary. It would be great if we were able to create site diaries which users can create and complete on a daily basis. Also have the ability to attach images to site diaries.
Guest over 6 years ago in SYNCHRO Control / Forms 0 Future consideration

Add multiple work areas at once

Besides the title, it would be great if one could also use 2D hatches to create work areas ( for example from AutoCAD)
Patryk Makowski over 1 year ago in SYNCHRO Modeler 0 Needs review

Ability to save Civil Tools Views

Users want to be able to save profile/cross-section views, with any visible measured dimensions. We should be able to save it to local drive/documents/included in saved views. The use case is to share the information and also attach to Forms. Curr...
Arpit Prakash over 4 years ago in SYNCHRO Control / Models 0 Future consideration

Functionality for User Fields when using iModel connectors

When a 3D model is imported directly into a Synchro Control project within the Synchro 4D Pro application (using File > Import), it is possible to create user fields. For example, I could import a 3D model and then I could set up a User Field c...
Ruth Fuller about 2 years ago in SYNCHRO Control / Models 0